| 1 | Excavation in foundation , trenches etc., in all kinds of soil such as pickwork, jumper work blasting work, in soft / hard rock, including chiseling wedging out of rocks clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil upto any lead and lift clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. |
| 2 | Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth. |
| 3 | Providing & laying design mix M-30 but not less than cement concrete 1 : 1.5 : 3 (1cement : 1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for reinforced concrete work in :- |
| 4 | Foundation,footing,bases of columns and the like & mass concrete. |
| 5 | Wall (any thickness but not less than 0.10 mts.Thickness)attached pillasters,buttresses plinth,& string courses etc.from top of found.level upto floor two level |
| 6 | Suspended floor,roofs,landing & shelves & their support balconies,beams,girders,bressumers & cantilever upto floor level. |
| 7 | Providing Tor steel reinforcement for RCC work i/c bending,binding & placing complete upto floor two level within all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. |
| 8 | Prov.form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish i/c centring shuttering,strutting & propping etc. with wooden battens & ballies,ht. of propping & centring below supporting floor to ceiling not exceeding 4.00 mts. & removal of the same for in situ-reinforced concrete & plain concrete work :- |
| 9 | Vertical surfaces such as wall (any thick.) partitions & the like i/c attached pillasters,buttresses,plinth & string courses & the like. |
| 10 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc with in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. |
| 11 | Laying,jointing and testing of galvanized mild steel tube Plain ended / screwed and socketed in trenches including cost of fabrication of bends as required at site of following dia including tube fittings and to the entire satisfaction of the Engineer-in-charge as per IS:1239 (Part-I)-1979 complete in all respect. (Cost of excavation, in trenches to be measured and paid for separately).(Labour Rate) |
| 12 | 100 mm dia Please Enable Macros to View BoQ information |