| 1 | Erection Part 63 KVA DTR (TS. No. 12/2026-27 W.B.S. D-26-0381) |
| 2 | Erection of 63 KVA DTR, LT Box, Cable and Energy meter complete in all respect. |
| 3 | Transportation Charges for complete Material |
| 4 | (Supply Part 63 KVA DTR) |
| 5 | Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA |
| 6 | Panel (Distribution Box LT 63 kVA DTR MCCB 100 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp |
| 7 | LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured |
| 8 | GO AB Switch Un it (11 KV, 400A 25 KA) |
| 9 | Lightning Arrester 11 KV (9 KV, 10 KA Porecelain) |
| 10 | Pipe Earthing Set |
| 11 | Aluminium Thimble 120 mm2 |
| 12 | Aluminium Paint |
| 13 | Erection Part LT Line (TS. No. 12/2026-27 W.B.S. D-26-0381) |
| 14 | Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 15 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 16 | Add Erection Charges for LT Earthing Set |
| 17 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. |
| 18 | Erection of LT line with ACSR 30 mm² 6/1/2.59 mm such as stringing, tensioning and sagging,jointing and fastening . |
| 19 | Add Manual Carriage |
| 20 | Transportation Charges for complete Material of LT line |
| 21 | (Supply Part LT LIne) |
| 22 | ACSR 6/1/2.59 mm (30 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} |
| 23 | Steel Tubular Poles (9 m, Working Load>200kgf/m²) (with Ruling Span 67 m) |
| 24 | Muffs with concerete filling |
| 25 | Shackle Insulator (16 kN) |
| 26 | D-Iron (U- Clamps) |
| 27 | Earth Knob complete |
| 28 | LT Stay Set |
| 29 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 30 | Full Clamps |
| 31 | Earthing Set complete |
| 32 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 33 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 34 | Aluminium Paint |
| 35 | Spiral PVC Spacer |
| 36 | Chief Electrical Inspection fee (For DTR and LT Line) Please Enable Macros to View BoQ information |