| 1 | Part A- Cost of Material For 11KV DP With AB Switch - 2 No. |
| 2 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 3 | Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 3 mtr.,2 no's channel(GI) required =(2x9.56x3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 4 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 5 | Supply & installation of AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each channel(GI) length 3 Mtr., 2 no's channel(GI) required =(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 6 | Supply & installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each channel(GI) length 0.35 mtr., 2 no's channel(GI) required =(9.56x2x0.35).Complete in all respect as per the approved technical specification and direction of EIC. |
| 7 | Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel(GI) length 0.8 Mtr..1 no's channel(GI) required =(7.14x0.8x1).Complete in all respect as per the approved technical specification and direction of EIC. |
| 8 | Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 3.0 Mtr., 4 no's channel(GI) required = (7.14x3x4). Complete in all respect as per the approved technical specification and direction of EIC. |
| 9 | Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 3.512 mtr.,4 nos angle(GI) required = (4x4.5x 3.512).Complete in all respect as per the approved technical specification and direction of EIC. |
| 10 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 11 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 12 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 13 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 14 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 15 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 16 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 17 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 18 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 19 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 20 | SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 21 | SITC of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 22 | SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 23 | Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC. |
| 24 | SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC. |
| 25 | Supply & installation of Wedge Connector for 55 Sqmm Conductor.Complete in all respect as per the approved technical specification and direction of EIC. |
| 26 | Supply & installation of Polycarbonate Bird Guard. Complete in all respect as per the approved technical specification and direction of EIC. |
| 27 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 28 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 29 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 30 | Part A- Cost of Civil Works. |
| 31 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. |
| 32 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 33 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 34 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design.Complete in all respect as per the direction of EIC. |
| 35 | Part B- Cost of Materials for 11 KV Pin Points - 0.005 CKM. |
| 36 | Supply & Stringing of 55 SQ.MM AAA Conductor. Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | Part C- Cost of Supply Of Materials for 11kv UG Length-0.68km. |
| 38 | Supply of materials for 11kV, 3Core, 120sqmm Aluminium, XLPE insulation armoured UG cable with accessories. |
| 39 | Length of 11kV 3C, 120sqmm cable (HDD) |
| 40 | Supply of 11kV, 3Core, 120sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 11.3kA and SC rating of Armour in kA- 12kA) as per the approved technical specification and direction of EIC. |
| 41 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV 3Core, 120 sqmm, aluminium UG cable kits. as per the approved technical specification and direction of EIC. |
| 42 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 120 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 43 | Supply of materials for High Density Polyethelene (HDPE) pipe 160mm diameter, PE 80- PN8 for rising of 11kV UG cable. as per the approved technical specification and direction of EIC. |
| 44 | Part C- Cost of Erection Of Materials. |
| 45 | Erection, Commissioning, Testing of 11kV new line by 3core, 120sqmm, aluminium, XLPE UG cable. |
| 46 | Installation,Laying, Commissioning & Testing of 11kV, 3Core, 120sqmm XLPE insulation UG cable by HDD method with HDPE pipe (160 mm dia, PN8 PE80) including supply of HDPE Pipe. as per the approved technical specification and direction of EIC.. |
| 47 | Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 120sqmm, aluminium UG cable kits. as per direction of EIC. |
| 48 | Laying of 160mm dia PE 80-PN8, HDPE pipe for rising of 11 KV UG cable.as per direction of EIC. |
| 49 | Part C- Cost of Civil Works. |
| 50 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
| 51 | Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length |
| 52 | Earth work excavation of soil. complete as per the direction of EIC. |
| 53 | Earth work excavation of hard rock. complete as per the direction of EIC. |
| 54 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 55 | Supply and erection of cable Route Marker along the cable route at an interval of 30 mtrs with civil works as per the direction of EIC. |
| 56 | Part D- Cost of dismantling of old materials. |
| 57 | Dismantling of 09/11 Mtr. Joist/WPB Pole- 116X100mm. complete as per the direction of EIC. |
| 58 | Dismantling / Removal of V Cross arm from pole.complete as per the direction of EIC. |
| 59 | Dismantling of 11kV Pin Insulator with Pin. complete as per the direction of EIC. |
| 60 | Dismantling of 11kV Disc Insulator with Hardware. complete as per the direction of EIC. |
| 61 | Dismantling / Removal of MS Channel, from Double Pole Structure /pole . complete as per the direction of EIC. |
| 62 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line. complete as per the direction of EIC. |
| 63 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |