Supply Of Supply of SMPS based IPS for LC gate and 4 line => Limited
Tender Overview
Project Description
Supply Of supply of smps based ips for lc gate and 4 line , supply of smps based integrated power supply (ips) system for lc gate and auto relay hut/line side cabinet with aftc/axle counter/msdac as per rdso spec. no. rdso/ spn/165/2023 vers ion 4.0 with amendment-1, along with surge protection device, status monitoring panel, spares, tool ki t, lmla battery 110v/500 ah consisting of 55 + 5 cells (cells as per rdso spec. irs: s-88/2004) along with battery stand. the configuration of ips should be as per attached drawing of nwr. this includes t ransportation to consignee depot to site, commissioning of integrated power supply system after duly filling pre-commissioning check list jointly by rdso approved vendor and railway representative. inst allation is required. ] , supply of smps based integrated power supply (ips) system for ei station up to 4 lines with block panel and lc gate as per rdso spec. no. rdso/ spn/165/2023 version 4.0 with amendmen t-1, along with surge protection device, status monitoring panel, spares, tool kit, lmla battery 110v/5 00 ah consisting of 55 + 5 cells (cells as per rdso spec. irs: s-88/2004) along with battery stand. th e configuration of ips should be as per attached drawing of nwr. this includes transportation to consi gnee depot to site, commissioning of integrated power supply system after duly filling pre-commission ing check list jointly by rdso approved vendor and railway representative. installation is required. ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply of SMPS based integrated Power supply (IPS) System for LC gate and auto relay hut/Line side cabinet with AFTC/Axle counter/MSDAC as per RDSO Spec. No. RDSO/ SPN/165/2023 vers ion 4.0 with Amendment-1, along with surge protection device, status monitoring panel, spares, tool ki t, LMLA battery 110V/500 AH consisting of 55 + 5 Cells (Cells as per RDSO spec. IRS: S-88/2004) along with battery stand. The Configuration of IPS should be as per attached drawing of NWR. This includes t ransportation to consignee depot to site, commissioning of integrated Power supply System after duly filling pre-commissioning check list jointly by RDSO approved vendor and Railway representative. Inst allation is required. ] |
| 2 | Supply of SMPS based integrated Power supply (IPS) System for EI station up to 4 lines with block panel and LC gate as per RDSO Spec. No. RDSO/ SPN/165/2023 version 4.0 with Amendmen t-1, along with surge protection device, status monitoring panel, spares, tool kit, LMLA battery 110V/5 00 AH consisting of 55 + 5 Cells (Cells as per RDSO spec. IRS: S-88/2004) along with battery stand. Th e Configuration of IPS should be as per attached drawing of NWR. This includes transportation to consi gnee depot to site, commissioning of integrated Power supply System after duly filling pre-commission ing check list jointly by RDSO approved vendor and Railway representative. Installation is required. ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender