|
| 1 | Resurfacing of Carriage Way |
| 2 | 4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method |
| 3 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 4 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. |
| 5 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | OD278013/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 40 mm thicknesscomposed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG30) to the required line, grade, and level to serve as wearing course on a previously preparedbase, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour.,laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to therequired level and grade. |
| 7 | Retaining Wall and Culverts |
| 8 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) |
| 9 | OD278049/2025-2026: Dry Stone Masonry work for foundation and Superstructure etc. complete as per drawing and technical specifications. |
| 10 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 11 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer |
| 12 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 13 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) |
| 14 | Road Safety Work. |
| 15 | 55.38a:Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on Structural Steel c section vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of structural steel c section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3. Please Enable Macros to View BoQ information |