| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : incl. diverting of nallah |
| 2 | P/L in position stone soling hand packed i/c all carriages complete. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 8 | Foundations, footings, bases of columns etc. for mass concrete. |
| 9 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Reinforcement for R.C.C work including straightening cutting, bending placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more..Including carriage of all materials involved with loading unloading and stacking complete. |
| 12 | Supply and filling of GSB/Nallhmuch in layers incl rolling, ramming, watering, consolidation with PRR i/c all carriages upto site complete job |
| 13 | Providing and Laying of 75mm thick compacted WBM(G-II) with specified stone aggregates of size (63to45 mm) including stone screenings of size 13.2 mm and binding material including sorting, spreading to template and consolidation with PRR of 08 to 10 Tonne capacity to specified camber,lines and gradients including loading unloading and carriages of all materials/equipments to site of work. work complete job. |
| 14 | carraige of material |
| 15 | stone agg. Above 40 mm for an avg lead of 10 km |
| 16 | stone agg. 40 mm below/sand for an avg lead of 10 km Please Enable Macros to View BoQ information |