|
| 1 | WSS Sarh, Bagga, Angralla, |
| 2 | Carriage of Material including loading, unloading and stocking of G.I Pipes from Jammu to site of for an average distance of 170 Km by Mechancal Transport and 05 km by head Load. |
| 3 | Carriage of Material including loading, unloading and stocking of HDPE Pipes from Jammu to site of for an average distance of 170 Km by Mechancal Transport and 05 km by head Load. |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 5 | Providing and fixing G.I. pipes/HDPE complete with fittings excluding trenching and refilling etc. (external work).80 mm dia. (G.I) |
| 6 | 15 mm dia. (G.I) |
| 7 | 40 mm dia (HDPE) |
| 8 | 32 mm dia (HDPE) |
| 9 | 25 mm dia (HDPE) |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 11 | WSS Tukson |
| 12 | Carriage of Material including loading, unloading and stocking of G.I Pipes from Jammu to site of for an average distance of 170 Km by Mechancal Transport and 05 km by head Load. |
| 13 | Carriage of Material including loading, unloading and stocking of HDPE Pipes from Jammu to site of for an average distance of 170 Km by Mechancal Transport and 05 km by head Load. |
| 14 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 15 | Providing and fixing G.I. pipes/HDPE complete with fittings excluding trenching and refilling etc. (external work).50 mm dia. (G.I) |
| 16 | 40 mm dia. (G.I) |
| 17 | 15 mm dia. (G.I) |
| 18 | 32 mm dia (HDPE) |
| 19 | 25 mm dia (HDPE) |
| 20 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Please Enable Macros to View BoQ information |