| 1 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 2 | OD47358/2026-2027:Hire charges for Hydraulic excavator of 1 cum bucket capacity for removing excess earth from road berm and shoulder, due to slipped earth, side cutting and rmoving fallen trees and wooden logs to road sides etc including all cost conveyance fuel and hire charges etc complete |
| 3 | OD47357/2026-2027:Engaging Labour for cutting branches of trees leaning to the road. |
| 4 | OD47361/2026-2027:Engaging Man mazdoor for helping wood cutting work ,removal of branches etc to road the side etc |
| 5 | OD53970/2026-2027:Engaging special Mazdoor for clearing chokked earth |
| 6 | OD47362/2026-2027:Engaging special mazdoor for removal and refixing of drain covering slab,removing the wooden log to road side, helping wood cutter to cut trees without falling on public utilities etc |
| 7 | OD47360/2026-2027:Jungle clearing including bushes small plants grass etc by using brush cutter removal of debris including labour charges transportation charges etc complete |
| 8 | OD47356/2026-2027:Supplying Ready Mix Bitumen Pothole Filler in 25Kg bags conforming to MoRTH & Specification Table 500-37 with instant Curing Properties, packed properly and conveniently including conveying and delivering to the PWD Roads section Irikkur. |
| 9 | OD47359/2026-2027:Engaging Man mazdoor for pothole filling. |
| 10 | OD47355/2026-2027:Conveyance of Ready Mix Bitumen Pothole Filler Compound to the required site in Auto pickup |
| 11 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) |
| 12 | OD47363/2026-2027:Hiring tipper to slipped earth and rock materials fell on the road or right of way due to land slide as per direction of engineer in charge |
| 13 | 55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. |
| 14 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer |
| 15 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications Please Enable Macros to View BoQ information |