| 1 | Dismantling of suspension clamp suitable for LT AB cable |
| 2 | Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 3 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 4 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 5 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 6 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 7 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 8 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 9 | Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors |
| 10 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 11 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 12 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 13 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 14 | Erection of suspension clamp for LT ABC of any size |
| 15 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 16 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 17 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 18 | Installation of Pre-insulated lugs for 70sqmm |
| 19 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 20 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 21 | Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 22 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 23 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 24 | Dismantling one section fuse from structure and bringing back to section store. |
| 25 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 26 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 27 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 28 | Additional rate for excavation of Pit for A type pole in Rock. |
| 29 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. |
| 30 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 31 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 33 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 34 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16 (Street Light) + 1 x 50 Sq.mm. (Insulated Messenger) |
| 35 | Dismantling of Anchor clamp / dead end clamp for LT AB cable |
| 36 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 37 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 38 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 39 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 40 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 41 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 42 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 43 | Fitting and providing one HT Fly stay for 11kV pole using A type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 44 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 45 | Renewal of existing damaged/old 11kV A type pole with new A type pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 46 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 47 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 48 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 49 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 50 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 51 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 52 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 53 | Fitting one set AB switch, DO fuse (3No.), LA (3No.),giving all connections from HT line to Transformer bush and drawing earth leads tothe ground for earthingexcluding provision of earthing and fixing channels. |
| 54 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 55 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 56 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 57 | Data is derived from Code TRS.01.267 within the Samagra software, where the unit of measurement is meters. |
| 58 | Data is derived from Code TRS.01.269 within the Samagra software, where the unit of measurement is meters. |
| 59 | Transporting UG Cable |
| 60 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 61 | Additional rate for excavating trench on tarred/concrete surface of specified size. |
| 62 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 63 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 64 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 65 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 66 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 67 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 68 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 69 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 70 | Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 71 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 72 | 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (cost index(c) : 1 included in Rate) |
| 73 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil (cost index(c) : 1 included in Rate) |
| 74 | Providing End Caps Please Enable Macros to View BoQ information |