| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD Specific - ations202(ii) A Sr.No.2.5 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motorgrader/ tractormountedappropriateequipmentonpreparedsurface,mixingbymix inplacemethod with rotavator at OMC, and compacting with smooth MORD Specifications 401 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, a MORD Specific - ations 405.3 |
| 5 | 600&Brick masonry work in cement mortar in foundation complete exccpting pointing and plastering 1200 as per drawing and technical specification clauses MORD Specific - ations 600 & 1200 Sr.No.11.5 |
| 6 | Plstering with cement mortar (1:4), 12 mm thick on brick work in substructure as per technical specification Clauses 613.4 and 1204 MORD Specific - ations 600 & 1200 Sr.No.12.3 |
| 7 | Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 Grade coarse & fine aggregates conforming to IS:383,maximum size of coarse aggregate not exceeding 25mm,mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design , laid in approved fixed side frame work ( steel channel laying and fixing of 125 micron thickpolythene film, wedges,steel plates including leveling the frame work as per drawing ), spreading the concrete with shovels,rakes compacted using needle , screed and plate vibrators and finished in continuousopration including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixturesas approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Tachnical Specification Clause 1501 including cost of polythene sheet |
| 8 | RCC work with approved coarse sand and 2 cm guage approved stone grit in 1:1.5:3 in lintels of doors, windows and sunsheds excluding supply of reinforcement and its fixing and binding the same with 24B.W.G.G.I binding wire and including necessary centering and shuttering etc required for proper completion of work. in M-20 Grade MORD Specific - ations 800 & 1200 Sr. |
| 9 | Mild steel or TMT Bars(Fe-500D grade or higher) or HYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel.MORD Specific - ations1000 Sr.No.12.6 |
| 10 | S/F of 3'-x2'-0 size black/green marble stone with all metter writing fixed in brick work/plastered by E/I Please Enable Macros to View BoQ information |