|
| 1 | Pre monsoon work 1 |
| 2 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually |
| 3 | OD52829/2026-2027:Lifting and replacing of RCC slab from the drain for removing silt/muck causing choking of drain all complete; as per the directions of the engineer-in-charge. |
| 4 | OD52833/2026-2027:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate) |
| 5 | OD52834/2026-2027:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor) |
| 6 | OD52832/2026-2027:Hire charges for wood cutting equipmets ,pulleys etc |
| 7 | OD52830/2026-2027:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil |
| 8 | OD52835/2026-2027:Engaging Man mazdoor for Clearing chalked culvert ,clearing Drain removing light jungles and other miscellaneous works,etc |
| 9 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br> |
| 10 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br> |
| 11 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> |
| 12 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 13 | 55.15:Refurbishment of existing signboards<br>Refurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. |
| 14 | OD52831/2026-2027:Engaging mazdoor for planting trees as per the directions of the engineer-in -charge( On the basis of direction by the district Forest Officer to plant trees in accordance with the cutting of dangerous trees along the roadside ) |
| 15 | Pre monsoon work 2 |
| 16 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means |
| 17 | 2.3.1.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means |
| 18 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 19 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 20 | OD52828/2026-2027:Supplying and conveying of ready mixed bituminous compound including engaging of labour and auto-pickups required in order to carry out the laying of the bituminous compound by filling potholes occurred during monsoon times or otherwise, controlling traffic etc. all complete as per the direction of the engineer-in-charge. |
| 21 | OD52824/2026-2027:Hire charges for crane |
| 22 | OD52826/2026-2027:Hiring Tipper to shift waste materials ,earth etc to a suitable location indicated by the departmental engineer Please Enable Macros to View BoQ information |