| 1 | Supply, Installation, Testing & Commissioning of modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling and heating, having 100% hermetically sealed inverter type Scroll Compressor(s) with and minimum two compressors along with two Condensing fan, above 14/18 HP modules, microprocessor based Controller, Side / top discharge type condensing unit(s), with R-410 A Refrigerant, vibration isolators, with suitable foundation etc. complete as required. The unit shall deliver the rated capacity at AHRI Conditions and work even at 50°C ambient temperature without tripping. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply. The unit shall be filled with first charge of the refrigerant and ready for use as required. The EER at 100% load with AHRI conditions shall not be less than 3.5 and Including OEM supplied Piping connection Kit etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 2 | Supplying and drawing flexible / stranded bare copper conductor, PVC / XLPE insulated, overall aluminium mylar tape shielded ATC drain wire and outer PVC sheathed industrial Instrumentation (shielded)cables voltage grade 300/500 V as per BS /EN 50288-7 in existing surface or recessed PVC/ MS conduit/casing capping / Cable tray / Open Duct making connections, testing etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for cables. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 3 | Un Armoured |
| 4 | 2 core x 1.5 Sq.mm |
| 5 | Providing & Fixing of IS : 4985 - 2000 Class -4 (10 Kgf / Sqcm) UPVC drain water piping with fittings (IS:7834 & 10Kgf/sqcm) like elbow, socket, Tee, solvent cement jointing, support with MS hanger on ceiling or recessed in wall with chasing & plastering with 6 mm thick closed cell elastomeric nitrile rubber insulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with thisBSR . |
| 6 | 32 mm |
| 7 | Supply , Installation, Testing and Comissioning of site fabricated ducting made from GI sheet metal conforming to IS:277 with a zinc coating grade not less than 120 GSM (both side inclusive) & fabricated as per IS:655 and as per approved drawings & designs including the cost of hangers, supports, angle, expansion fasteners , closed cell neoprene gasket T&P etc. as required of following thickness. Test Certificate for Galavanizing with lot no. to be submitted. All as per pre approved by Engineer in charge. For additionaltechnical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 8 | 0.60 mm |
| 9 | 0.80mm |
| 10 | Supply , Installation, Testing and Comissioning of site fabricated ducting made from aluminium sheet conforming to IS:737, Grade 31000 fabricated as per IS:655 and as per approved drawings & designs including the cost of hangers, supports , angle , expansion fasteners , closed cell neoprene gasket T&P etc. as required of following thickness. All as per pre approved by Engineer in charge. For additional technical parameters of products/work , refer Annexure \\"A\\" attached with this BSR . |
| 11 | 0.80mm |
| 12 | Supplying, installing, testing and balancing of extruded Aluminium powder coated Air Diffuser and complete with Flush, 20mm flanges with PVC/neoprene gasket, anti – smudge frame and removable inner core to facilitate the adjustable of air control damper, square/round/ rectangular as required.including fixing with steel screws etc. complete in all respect. All as per pre approved by Engineer in charge. For additional technical parametersof products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 13 | Supply Air Diffuser with Volume Control damper |
| 14 | Return Air Diffuser without Volume Control damper |
| 15 | Supply & fixing of external thermal closed-cell Nitrile rubber Insulation material FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 in form of sheet on duct including cost of adhesive (CPRX Compound) complete as required. All as per preapproved by Engineer in charge. |
| 16 | 13mm thick for indoor Application |
| 17 | Supplying, installation, testing and commissioning of fire dampers, the blades and frame shall be min. 1.6 mm thick GI and factory fitted in a sleeve made out of 1.6 mm thick GI of min. 400 mm long, as & where required, of required sizes including control wiring. The damper shall be motorized and spring return so as to close the damper in the event of power failure automatically and open the same in case of power being restored. The spring return action shall be inbuilt mechanism and not externally mounted. The damper shall also be closed in the event of fire signal. CBRI tested and certified for 90 minute fire rating etc. complete as required and as per specifications. (Total assembly should be UL listed) |
| 18 | Actuator |
| 19 | Supply, installation, testing and comissioning of interconnecting copper refrigerant piping of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. duly insulated with tubular elastomeric nitrile rubber FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 including chase cutting andfilling with mortar, Slotted channel supports mounted on 10 mm threaded rod at suitable spacing the exposed piping shall be wrapped with glass woven cloth and lag coating for vapour barrier and weather protection. Joints shall be covered with nitrile rubber tape of 3 mm thick complete as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 20 | 28.6 mm O.D., wall thinkness ≥ 1.2mm (insulation – 19 mm thick) |
| 21 | 22.2 mm O.D., wall thinkness ≥ 1.0mm (insulation – 19 mm thick) |
| 22 | 19.1 mm O.D., wall thinkness ≥ 1.0mm (insulation – 13 mm thick) |
| 23 | 15.9 mm O.D., wall thinkness ≥ 0.8mm (insulation – 13 mm thick) |
| 24 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500- micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . Please Enable Macros to View BoQ information |