| 1 | Lifting / disposal of excavated/ dismantelled unservicable material from site of work to dumping site by mechinical transport including loading,unloading beyond municipal limits. as per direction of Engineer-in-charge: |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil |
| 3 | Providing and laying stone soling/ hand packed (above 75 mm) including all sorts of carriages by all means of transport upto site of work complete job . |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:(a) Foudation, footings, basis, coloums etc |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all carriages complete job.(TMT Bars) |
| 9 | Earth filling (Sweet Earth ) got by lorries including loading, unloading,ramming in layers, dressing, watering & royality including all carriages upto site of work complete job as per directions of engineer incharge. (earth stack measured will be reduced by 20% for payment ) |
| 10 | Carriage of materials by mechanical transport from source upto the site of work complete job .A) Stone agg 40mm from Athwajan 15 kms lead |
| 11 | b) Stone agg 20mm from Athwajan 15 kms lead |
| 12 | Sand from Ganderbal 23 Km lead |
| 13 | Supply and fixing of sign board at site of required size including taking /printing out geo tagged Photographs before, during and after execution of work complete job as per the directions of EIC Please Enable Macros to View BoQ information |