| 1 | Shifting of 11 kV HT Line |
| 2 | ACSR 6/1/2.59 mm sq |
| 3 | Steel Tubular Poles 9 Mtr. W/L 200Kg |
| 4 | Muffs with concerete filling |
| 5 | Cross Arm: [Channel Iron (100x50x5 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 2 structure |
| 6 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 2 structures |
| 7 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure. |
| 8 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. |
| 9 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2No. |
| 10 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x5, Length: 2340 mm x 2 No.] ∆ Formation |
| 11 | Discs insulator sets (Cleaves and Tong) Helically fromed fitting |
| 12 | G.O Switch 11 KV |
| 13 | D.O Fuse Unit |
| 14 | Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 15 | Stay Wire (7/3.15 m) (9.0 kg Per Stay Set) |
| 16 | HT Earthing set complete (REC Constr. Stand. J-1) |
| 17 | GI Wire 8 SWG for Guarding across the road |
| 18 | Eye Hook for earth wire |
| 19 | Earth Reel |
| 20 | Pole Top Bracket [MSCI:100x50x6 m- 100 m] |
| 21 | Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro'structure: 2 No ] |
| 22 | Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro'structure: 2 No] |
| 23 | Danger Plate (250X200X1.6 m) |
| 24 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mΦ or more (with flat and spring washers)] |
| 25 | Barbed Wire |
| 26 | Aluminium Paint |
| 27 | Red Oxide |
| 28 | MS Channel Iron: 50x50x6, Length : 2400 m for Road crossing |
| 29 | Battery Bank 30V, 200AH with Allied Spares |
| 30 | Battery Charger 30V, 200 AH with Allied Spares |
| 31 | Transportation Charges complete in all respect. |
| 32 | Dismantling Charges Existing Conductor, Poles including all other allied accessories and handover all the material to divisional store complete in all respect. |
| 33 | Erection Charges of Conductor complete in all respect. |
| 34 | Erection Charges of Poles 11 Mtr Double Structure complete in all respect. |
| 35 | Erection Charges of Poles 11 Mtr Single Structure complete in all respect. |
| 36 | Erection Charges of Earthing Set Complete in all respect. |
| 37 | Erection Charges of GI Wire Complete in all respect. |
| 38 | Erection Charges of HT Stay complete in all respect. Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |