| 1 | 63 kVA DTR |
| 2 | Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA |
| 3 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 4 | Muffs with concerete filling |
| 5 | X-Arm: [Channel Iron (100x50x6 m), Length : 2800 mX 2 Nos] for incomer line |
| 6 | MS Angle Iron (50X50x6 m), Length: (2800 m) x1 Nos for LA's |
| 7 | X-Arm: [Channel Iron (75x40x6 m), Length : (2800 mX 4 Nos] for supporting DO fuse unit & GO switch |
| 8 | X-Arm: [Channel Iron (100x50x6 m), Length : 2800 mX 2 Nos] for Transformer Bed |
| 9 | X-Arm[Channel Iron (100x50x6 m), Length : (460 m) x 2 Nos for supporting Main Channel of Transformer] |
| 10 | MS Angle Iron (50X50x6 m), Length : (2800 m) x 2 Nos |
| 11 | MS Angle Iron (35X35x5 m), Length : (460 ) x 2 Nos |
| 12 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 13 | MS Angle Iron (50X50x6 m), Length : (2800 m) x 2 Nos |
| 14 | MS Angle Iron (50X50x6 m), Length : (450 m) x 1 Nos |
| 15 | GO Switch Handle Supporting: [Channel Iron (75x40x6 m), Length :460 m |
| 16 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 17 | D.O Fuse Unit |
| 18 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 19 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90kN) including Dead End Clamps etc.) |
| 20 | Stay set complete |
| 21 | Stay Wire (7/3.15 m) (7.0 kg Per Stay Set) |
| 22 | Pipe Earthing Set |
| 23 | 6 SWG GI wire for Earthing |
| 24 | LT Distribution Panel Box with MCCB(40A, 25 kA, 4P) and SFU(16A,4No, rewirable) |
| 25 | Half Clamp (M.S. Flat 50X6 m) |
| 26 | Full Clamps (M.S. Flat 50X6 m) |
| 27 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mmΦ or more (with flat and spring washers)] |
| 28 | AluminiumThimble |
| 29 | Copper Thimble 35mm² |
| 30 | Danger Plate |
| 31 | Barbed Wire |
| 32 | Cable (3.5 Core) 95mm² |
| 33 | Energy Meter (3-Phase, 4-Wire) DLMS compliant CT Type 100/5 |
| 34 | ACSR 6/1/3.35 sq.mm Conductor for earthing |
| 35 | AluminiumPaint. |
| 36 | Red Oxide |
| 37 | LT Switched Capacitors 27-Kvar for 63 kva (rate per KVAr) |
| 38 | Chain Link fencing ,Angle Iron ,Gate etc for transformerfencing |
| 39 | Transportation Charges complete in all respect. |
| 40 | Erection of Charges of 63 kVA DTR complete in all respect. |
| 41 | 11 kV HT Line |
| 42 | Conductor AAAC 7/3.15mm sq. |
| 43 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 44 | Muffs with concerete filling |
| 45 | Cross Arm: [Channel Iron (100x50x6 m), Length : 1270 mmi/c tolerance of 100 mm either side)x 2 structure |
| 46 | Angle Iron (50X50x6 m), Length: 750 mm x 2 No.x 2 structures |
| 47 | C.I F.G. X-Arm for Double Pole structure (2400*100*50)mm x 2 Nos. |
| 48 | Belt set - MS Angle Iron : 50x50x6, Length : 1800 mm x 2 No. |
| 49 | X-Bracing Set- MS Angle iron : 50x50x6, Length :2125 mm x 2 No. |
| 50 | C.I F.G X-Arm for GO Switch (2400*100*50)mm |
| 51 | 11KV Pin Insulators (Porcelain, 12kv, 10 KN ):3 No per Pole Structure |
| 52 | Disc Insulators Sets (cleaves and Tong) Helically formed fitting |
| 53 | GO Switch 11 kv |
| 54 | DO fuse unit |
| 55 | Stay Set complete in all respect (2 No. / Single Pole , 4 No./Double Pole Structures |
| 56 | Stay Wire (7/3.15 m) (7.0 kg Per Stay Set) |
| 57 | HT Earthing Set complete (REC Constr. Stand.J-1) |
| 58 | G.I wire 8 SWG for Guarding across the road |
| 59 | Eye Hook for Earth Wire |
| 60 | Earth Reel |
| 61 | Pole Top Bracket (MSCI:100x50x6 m -100 m) |
| 62 | 11 kV 2500 Volt megger 5kV - 200GOhm |
| 63 | Half Clamps:{on Double Pole Dead End Structure: 4 No; On Run Thro' Structure : 2 No } |
| 64 | Full Clamps:{on Double Pole Dead End Structure: 4 No; Single Pole Run Thro' Structure : 2 No } |
| 65 | T&P for 11kV HT Line Epson EcoTank L3250 Printer, A4 Wi-Fi All-in-One Ink for division office. |
| 66 | Danger Plate |
| 67 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mΦ or more (with flat and spring washers)] |
| 68 | Barbed Wire |
| 69 | AluminiumPaint. |
| 70 | Red Oxide |
| 71 | Erection charges of Conductor 6/1/3.35 mm sq. Complete in all respect. |
| 72 | Erection charges of Pole 9 Mtr Single Structure Complete in all respect. |
| 73 | Erection charges of Double Pole structure Complete in all respect. |
| 74 | Erection Charges of Earthing Set Complete in all respect. |
| 75 | Erection Charges of G.I Wire Complete in all respect. |
| 76 | Erection Charges of GO Switch Complete in all respect. |
| 77 | Erection Charges of HT Stay Complete in all respect. |
| 78 | Transportation Charges Complete in all respect. Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |