| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar. (17-Chapter Si.No.6) |
| 2 | Removal of Silt for Nala/Nali in liquid mud or faul position with special T&P including lead 30m and lift up to 3.00m etc. all complete. (As per Attached sanctioned rate analysis) |
| 3 | Dismantling Reinforced Cement Concrete or Reinforced brick work including stacking of materials as directed by E/IC with in a distance of 60 meters (200 feet). (17-Chapter PWD. No.694) |
| 4 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 5 | Providing of 8HP desel Pump set for dewatering including hire and fuel charge with operator etc. all complete. (None Scheduled) |
| 6 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 7 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) |
| 8 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 Cement : 4 Coarse sand.(Chapter No.13 Si.No.2) |
| 9 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) |
| 10 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter Si.No.8) |
| 11 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 12 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
| 13 | Sub Total (A) |
| 14 | Deduction Cost of old brick |
| 15 | Deduction Cost of old brick bats |
| 16 | Sub Total (B) |
| 17 | Sub Total (A-B) = (C) |
| 18 | Add / Deduction For Estimate Figure Amount Match |
| 19 | Grand Total Please Enable Macros to View BoQ information |