| 1 | Dismentling of rcc work i/c stacking dismentled material with in 60m in distance as directed by engineer incharge |
| 2 | Dismentling of old damaged pavement i/c stacking dismentled material with in 60m in distance as directed by engineer incharge |
| 3 | Resoling with serviceable material obtained |
| 4 | Earthwork in cutting or in embankment in ordinary soil by carted earth from 15 kms including leveling dressing & ramming the same etc all Complete. |
| 5 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surpluse earth as directed by the Engineer incharge upto a distance of 30 m from the foundation trenches. (Excluding Royality Rs. 30 ) As per S.I. No. 251 Excluding GST |
| 6 | Concrete with 40mn gauge B/B, fine sand of 1.25 FM and Cement in proportion of 12:6:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI.N0.273 |
| 7 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 |
| 8 | Provoiding concrete for plain/reienforced concrete in open foundations as per drawing and technocal specifications clauses 802,803,1202,1203 (11.4(iii) 800 and1200) |
| 9 | Provoiding and laying of Rubber Moulded Reflective Zig-Zag 80mm thick tiles of precost compressed C.C. Passing miniumum 30mpa compressive strength-ISI Marked concrete block pavements having thickness 80 mm as per technical specification clause 1504 |
| 10 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) as per D.S.R Item no. 20.3.1 1-300mm dia piles |
| 11 | 12m thick plaster 1:4 with cement & fine sand mortar.SI NO.597c |
| 12 | R.C.C work with with cement approved course sand and 2 cm approved stone grit in praportion of 1:1.5:3 in SLAB excluding supply of renforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire including necessary centering and shuttering i/c all.As. per S.I. No. 284 |
| 13 | M.S. (tor steel or plain) in plain work such as Rcc or R.B. work including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Exculding GST. SI No. 504 |
| 14 | Suppply and fixing of sign board I/C all. |
| 15 | As per Order of Joint Secretary G.O. No. G-1877 Dated 21-02-2025 and Director cum-chief Engineer U.P. RED, Lucknow Latter No 801 Dated 03-03-2025 Deduction 5% for Comptetive Price Effciency Please Enable Macros to View BoQ information |