|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m out side the periphery of the area cleared. |
| 2 | Ploughing the existing ground to a depth of 15cm to 25cm and watering the same . |
| 3 | Rough dressing the trenched ground including breaking clods. |
| 4 | Uprooting weeds from the trenched area after 10 to 15 days of its foolding with water including disposal of uprooted vegetation. |
| 5 | Fine dressing of the ground. |
| 6 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ration of 2:1 by volume ( part of stacked volume of earth afte reduction by 20% : 1 part of stacked volume of manure after reduction by 8% ) follding with water dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) |
| 7 | Holes 60cm dia, and 60cm deep |
| 8 | Holes 45cm dia and 45cm deep |
| 9 | Supplying of chlorpyriphos 20% E.C/ Lindane 20% E.C for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e, 12 times in a year hence it comes 24ml/plant or 0.024ltr/plant. |
| 10 | Supply and stacking of well decayed cattle manure at site including roylty and carriagge up to 5km lead complete. ( Cattle manure measured in stacks will reduced by 8% for payment) |
| 11 | Spreading sludge dump manure and/ or good earth in required thickness as per direction of officer in charge ( cost of sludge, dump manure and/ or directed by the officer in charge. |
| 12 | Mixing earth and sludge or manure in the required proportion specified or directed by the officer in charge. |
| 13 | Supply and stacking of selection No. 1/doob grass at site fresh & free from weeds having proper roots in green including loading, unloading carriage and all taxes paid etc. and as per direction of officer in charge. |
| 14 | Grassing with selection No. 1/ Doob grasss including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed ( the grass and good earth shal be paid for separately). |
| 15 | Preparation of beds for hedging and shurbbery by excavation 60 cm deep and trenching the excavated base to a further depth of 30cm, fefilling the excavated earth after breaking clods and mixing with sludge or mnaure in the ratio of 8:1 (part of stacked volume of earth after reductin by 20% : one part of stacked volume of sludge or manure after reduction by 8% ), flooding with water, filling with earth if necessary watering ad finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as derected within a lead of 50m lift up to 1.5m complete (cost of sludge, manure or extra a lead of 50m, lift up to 1.5m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 16 | Providing and stacking of Duranta Golden having ht. 15 to 20cm bushty shape with fresh and healthy leaves in 15cm size of earthen pot/plastic pot & as per direction of the officer in charge. (DSR-18, 6.12pg. no.153) |
| 17 | Supply of Gypsm well packed at site in bags. |
| 18 | Supply of DAP at site in printed plasic bags. (market rate.) |
| 19 | Supply & planting of plants common varieties as required by engineering incharge in 5 kg poly bags or Earthen pots ( Not below than 8-10 ) well branched and fully foliage branching dia 0.75 to 1.00mtr. Free from disease at site i/c stacking with bamboos (Pulmeria Alba, Champa, largestonia, neem etc. |
| 20 | Supply & planting of shrubs plants height 2-2.5 feet as required by engineering incharge in 6x8 polythene bags or earthen pot fully foliage and well branched free from disease. Shrubs ( Himalia chandani, Etc.) |
| 21 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains ( not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m 2.8.1 all kinds of soil |
| 22 | Providing laying, jointing and testing of PVC(Finolex make ring fit) of following dia 6kh/cm2 including all specials & fittings etc. as required for proper completion of work (The contractor has to arrange the source of water and require head for testing). (Ar/YEIDA). |
| 23 | Providing and fixing of hydrant with gate valve and all the fittings etc. complete. 32mm dia |
| 24 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hergs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, purning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers ( whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office in charge ( cost of Good Earth, manure , fertilizer, insecticide pesticide will be provided by the department & lawn mover and brush cutter with fuel and other T & P material / articles shall be provided by the contractor.) and as per direction of officer in charge. |
| 25 | Play grounds/Public parks ( Mali for 2.00Acre.) |
| 26 | Boring of tubewell with: Supplying assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818 , including required hire and labour charges, fittings & accessories etc. all complete for all depths, as per direction of Engineer in charge. |
| 27 | Providing profuse watering arrangement for lawn/Park at site to make avialable for irrigation i.e. Diesel engien & oil etc, RH Pipe/ Canvas pip & other T&P etc. in the proces of watering submerisible pump & accessories as per direction of officer in charge of work. |
| 28 | Complete maintenance of trees on road side plantation (RSP) ( Out side garden features ), jobs like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T & P material/ articles shall be provided by the contractor )and as per direction of officer in charge. |
| 29 | (i) trees (up to 4 & up to 3 year slow & Fast growing group) |
| 30 | Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work . Water tanker having 5000 lit. capacity with one labour for watering i/c cost of water, filling of tanker, watering at site with all leads and lifts as per direction of officer in charge. (Rate analysed as per DSR-18 on actual observation ) |
| 31 | (i) trees (up to 4 & up to 3 year slow & Fast growing group) |
| 32 | Fixing of tree guard Please Enable Macros to View BoQ information |