|
| 1 | Carrying out servicing/maintenance of Capacity 200 KVA DG set, Make : 'Greaves GPWII-PIV-200C and GPWII-PIV-200M or As available at site' including 'B' and 'C' check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'Greaves GPWII-PIV-200C (likely for compact/cpcb iv) and GPWII-PIV-200M or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Greaves |
| 2 | Supply only For 'B' and C-Check of 200 Kva x4 (For Item No. 2 to 7) Element -Pre -Fuel filter Part no-001200240911 |
| 3 | Element -Micro -Fuel filter Part no-001200240912 |
| 4 | LUB OIL FILTER(232V12) Part n0-=605411880008 |
| 5 | ELEMENT TO AIR FILTER 105413100107 Part no-141109234242 |
| 6 | Air Filter Element Safety Part no-141109234243 |
| 7 | Cogged Belt AX 46 Part No.- 103460211168 |
| 8 | Carrying out servicing/maintenance of Capacity 160 KVA DG set, Make : 'Greaves GPWII-PII-160 and GPWII-PIV-160M/C or As available at site' including 'B' and 'C' check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- ' 'Greaves GPWII-PII-160 and GPWII-PIV-160M/Cor As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Greaves |
| 9 | Supply only For 'B' and C-Check of 160 Kva x3 (For Item No. 09 to 14) Element -Pre -Fuel filter Part no-001200240911 |
| 10 | Element -Micro -Fuel filter Part no-001200240912 |
| 11 | LUB OIL FILTER(232V12) Part n0-=605411880008 |
| 12 | ELEMENT TO AIR FILTER 105413100107 Part no-141109234242 |
| 13 | Air Filter Element Safety Part no-141109234243 |
| 14 | Cogged Belt AX 46 Part No.- 103460211168 |
| 15 | Carrying out servicing/maintenance of Capacity 125 KVA DG set, Make : 'Greaves GPWII-PII-125 and GPWII-PIV-125C or As available at site' including 'B' and 'C' check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- ' 'Greaves GPWII-PII-125 and GPWII-PIV-125C or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Greaves |
| 16 | Supply only For B and C-Check of 125 KVA x2 (For Item No. 16 to 24) Element -Pre -Fuel filter Part no-001200240911 |
| 17 | Element -Micro -Fuel filter Part no-001200240912 |
| 18 | LUB OIL FILTER(232V12) Part n0-=605411880008 |
| 19 | ELEMENT TO AIR FILTER 105413100107 Part no-141109234242 |
| 20 | Air Filter Element Safety Part no-141109234243 |
| 21 | Pri Filter Element Part No.- P21109230191 |
| 22 | Sec Filter Element Part No. -P21109230192 |
| 23 | Gasket for Rocker Cover Part No.- P21108530304 |
| 24 | AX 45 Cogged Belt Part No.- 103460211143 |
| 25 | Carrying out servicing/maintenance of Capacity 82.5 KVA DG set, Make : 'Greaves GPWII-PII-82.5 and GPWII-PIV-82.5C or As available at site' including 'B' and 'C' check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- ' 'Greaves GPWII-PII-82.5 and GPWII-PIV-82.5C or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Greaves |
| 26 | Supply only For C-Check of 82.5 KVA x2 (For Item No. 26 to 38) Element Fuel filter Part no-141107406154 |
| 27 | Water Separator Element Part No.-141107406134 |
| 28 | LUB OIL FILTER(232V12) Part n0-=605411880009 |
| 29 | ELEMENT TO AIR FILTER 105413100107 Part no-141109234242 |
| 30 | Air Filter Element Safety Part no-141109234243 |
| 31 | Pri Filter Element Part No.- P21109230191 |
| 32 | Sec Filter Element Part No. -P21109230192 |
| 33 | Gasket for Rocker Cover Part No.-P21108530304 |
| 34 | AX 45 Cogged Belt Part No.- 103460211143 |
| 35 | Supply and filling Greaves Lub oil CK4-20W40 Part No.- 123200198834( 20 Ltr pack) |
| 36 | Supply and filling in Diesel Exhaust Fluid (D.E.F) compatible with existing DG Set complete all as specified and as directed. Part No.-141100197018 (20 Ltrs Pack)Make:Greaves |
| 37 | Supply only lubrication oil SAE-40 ( 15 W 40 grade CI 4) of Make: Castrol, Valvoline,Greaves. |
| 38 | Supply only Jute cotton waste (as per sample) for cleaning & day to day maintenance of silencer & DG set installed at different location at this station. |
| 39 | Carrying out servicing/maintenance of Capacity 250 KVA DG set, Make : 'kirloskar' KG1-1-250WS and KG4-250WS1 or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- ' 'KG1-1-250WS and KG4-250WS1 or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Kirloskar |
| 40 | Supply only For B-Check and 'C' Check of 250 KVA x2 (For Item No. 40 to 44) Lub Oil Filter model- KF0-03-1-2608 |
| 41 | Water Separator Element Part No.-F6.004.09.0.00 |
| 42 | Fuel Filter as per site requirement |
| 43 | (c) Supply only Air clean element primary as per site requirement |
| 44 | (c) Supply only Air clean element secondary as per site requirement |
| 45 | Carrying out servicing/maintenance of Capacity 200 KVA DG set, Make : 'kirloskar' KG4-200WS1 or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'KG4-200WS1 or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Kirloskar |
| 46 | Supply only For B-Check and 'C' Check of 200 KVA x4 (For Item No. 46 to 50) Lub Oil Filter model- KF0-03-1-2608 |
| 47 | Water Separator Element Part No.-F6.004.09.0.00 |
| 48 | Fuel Filter as per site requirement |
| 49 | Supply only Air clean element primary as per site requirement |
| 50 | Supply only Air clean element secondary as per site requirement |
| 51 | Carrying out servicing/maintenance of Capacity 180 KVA DG set, Make : 'kirloskar' KG1-180WS1 or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'KG1-180WS1 or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Kirloskar |
| 52 | Supply only For B-Check and 'C' Check of 180 KVA x2 (For Item No. 52 to 56) Lub Oil Filter model- KF0-03-1-2608 |
| 53 | Water Separator Element Part No.-F6.004.09.0.00 |
| 54 | Fuel Filter as per site requirement |
| 55 | Supply only Air clean element primary as per site requirement |
| 56 | Supply only Air clean element secondary as per site requirement |
| 57 | Carrying out servicing/maintenance of Capacity 125 KVA DG set, Make : 'kirloskar' KG1-125WS1 or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'KG1-125WS1 or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Kirloskar |
| 58 | Supply only For B-Check and 'C' Check of 125 KVA x3 (For Item No. 58 to 62) Lub Oil Filter model- KF0-03-1-2608 |
| 59 | Water Separator Element Part No.-F6.004.09.0.00 |
| 60 | Fuel Filter as per site requirement |
| 61 | Supply only Air clean element primary as per site requirement |
| 62 | Supply only Air clean element secondary as per site requirement |
| 63 | Carrying out servicing/maintenance of Capacity 50 KVA DG set, Make : TPDG50 or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'TPDG50 or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Tata |
| 64 | Supply only For B-Check and 'C' Check of 50 KVA x3 (For Item No. 64 to 68) Lub Oil Filter model- LF3959 |
| 65 | Water Separator Element |
| 66 | Fuel Filter as per site requirement |
| 67 | Supply only Air clean element primary as per site requirement |
| 68 | Supply only Air clean element secondary as per site requirement |
| 69 | Carrying out servicing/maintenance of Capacity 35 KVA DG set, Make : C35D5P or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'C35D5P or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Cummins |
| 70 | Supply only For B-Check and 'C' Check of 35 KVA x1 (For Item No. 70 to 74) Lub Oil Filter model as per site requirement |
| 71 | Water Separator Element as per site requirement |
| 72 | Fuel Filter as per site requirement |
| 73 | Supply only Air clean element primary as per site requirement |
| 74 | Supply only Air clean element secondary as per site requirement |
| 75 | Carrying out servicing/maintenance of Capacity 20 KVA DG set, Make : C20D5P or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'C20D5P or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Cummins |
| 76 | Supply only For B-Check and 'C' Check of 20 KVA x1 (For Item No. 76 to 80) Lub Oil Filter model as per site requirement |
| 77 | Water Separator Element as per site requirement |
| 78 | Fuel Filter as per site requirement |
| 79 | Supply only Air clean element primary as per site requirement |
| 80 | Supply only Air clean element secondary as per site requirement |
| 81 | Carrying out servicing/maintenance of Capacity 82.5 KVA DG set, Make : C82.5D5P or As available at site' including 'B' check and 'C' Check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- 'C82.5D5P or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Cummins |
| 82 | Supply only For B-Check and 'C' Check of 82.5 KVA x1 (For Item No. 82 to 86) Lub Oil Filter model as per site requirement |
| 83 | Water Separator Element as per site requirement |
| 84 | Fuel Filter as per site requirement |
| 85 | Supply only Air clean element primary as per site requirement |
| 86 | Supply only Air clean element secondary as per site requirement |
| 87 | Carrying out servicing/maintenance of Capacity 100 KVA DG set, Make : 'Greaves GPWII-PII-100 and GPWII-PIV-100C or As available at site' including 'B' and 'C' check as per manufacturers manual through authorised dealer of DG set manufacturer of existing DG Make and testing of DG set complete all as directed by Engineer-in-Charge. Note :- All material/spares parts required for carrying out above maintenance/servicing shall be measured and paid separately as 'Supply only' items as mentioned below and shall be of make- ' GPWII-PII-100 and GPWII-PIV-100C or As available at site' as per make of DG set and labour element required for replacing the spares parts including replacement of minor spare parts which are essential for carrying out servicing/maintenance of DG sets shall deemed to be included in the unit rate quoted by the tenderer against item No.1 above. (i) Any minor parts such as screws, washers, split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after every three hundred hrs run of DG Set and shall be measured and paid separately, no of times carried out during entire period of contract .(iii) The Item Include Servicing and cleaning of radiator and taking down fuel tank and cleaning and removal of scale and sludge.Note :- Filter Make :- Greaves |
| 88 | Supply only For C-Check of 100 KVA x2 (For Item No. 88 to 92) Lub Oil Filter model as per site requirement |
| 89 | Water Separator Element as per site requirement |
| 90 | Fuel Filter as per site requirement |
| 91 | Supply only Air clean element primary as per site requirement |
| 92 | Supply only Air clean element secondary as per site requirement |
| 93 | Supply & Filling of coolent Antifreeze Capacity for radiators of 20 to 250 KVA cap acity DG set complrtr all as specified and directed (should be packed of 10 ltrs bucket Greaves kool)( Make:- Greaves part No. 141100195038 |
| 94 | S&F Battery for starting of DG set of cap 150 AH with copper Lead & clamp complete all as specified. |
| 95 | S&F in repair/ replacment of Self starter/Cranking motor, auto lock, 12/24V of existing make or As availalbe at site on the 20 KVA to 100 KVA DG Set and taking out u/s self starter from DG set. |
| 96 | S&F in repair/ replacment of Self starter/Cranking motor, auto lock, 12/24V of existing make or As availalbe at site on the more than 100 KVA but not more than 250 KVA DG Set . |
| 97 | S&F in repair/ replacment of Alternater for battery charging, , 12/24V of existing make or As availalbe at site on the 20 kVA to 100 KVA DG Set and taking out u/s self starter from DG set. |
| 98 | S&F in repair/ replacment of Alternater for battery charging, , 12/24V of existing make or As availalbe at site on the more than 100 KVA but not more than 200 KVA DG Set and taking out u/s self starter from DG set. |
| 99 | S&F in repair/replacment of turbo charger assembly of the 20 kVA to 100 KVA DG Set make Sudhir CS500D5P or As availalbe at site testing complete as directed by Engineer in Charge. |
| 100 | S&F in repair/replacment of turbo charger assembly of more than 100 KVA but not more than 250 KVA Set make As availalbe at site testing complete as directed by Engineer in Charge. |
| 101 | S&F in repair /Replacment of water pump and replacement of water kit and water seal and connected item of 20 KVA to 100 KVA DG Set complete all as directed. |
| 102 | S&F in repair /Replacment of water pump and replacement of water kit and water seal and connected item of more than 100 KVA but not more than 250 KVA DG Set complete all as directed. |
| 103 | S&F in repair/ replacement of control unit/ panel including all accessries and mounting incl base card of 20 KVA to 100 KVA DG Set installed at Power House Make Sudhir . |
| 104 | S&F in repair/ replacement of control unit/ panel including all accessries and mounting incl base card of more than 100 KVA but not more than 250 KVA DG Set installed at Power House .. |
| 105 | S&F in repair/Replacement AVR unit suitable for DG set upto 250 KVA capacity Make As availalbe at site |
| 106 | Supply only Hose ATS Coolent Pipe as per site requirement |
| 107 | Supply only Hose SS Br Pipe as per site requirement |
| 108 | Supply only Hose pipe & Flexible pipe complete set. as per site requirement |
| 109 | Supply only Fan belt for water pump/ alternator as per site requirement |
| 110 | Repair/servicing of radiator assembly with intercooler of DG Set of Cap more than 20 KVA but not more than 250 KVA set,' after dismanteling and removing cooling fans, guard plates and lowering the same from engine after draining out coolent from radiator and scrapping / removing sludge / scale inside tank with acid including replacement MS tank (botom portion) at rusted portion by cutting/ welding / brazing with 2mm thick copper plate including painting. Remounting the same at its original position and repalcement of pre mixed coolent as per the ratio fixed by manufacturer and testing complete all as directed by Enginer-in-Charge. (Note- Pre mixed coolent shall be measured and paid separately under relevant item of schedule)(ii) The Job shall be carried out after every two hundred hrs run of DG Set and shall be measured and paid separatly, no of times carried out during entire period of contract . |
| 111 | Dismantling and opening of turbo charger assembly of DG Set of Cap more than 20 KVA but not more than 250 KVA set, and repair/overhauling and replacement of turbo charger kit and all type of spare parts including refixing, testing complete as directed by Engineer in Charge.(ii) The Job shall be carried out after every two hundred hrs run of DG Set and shall be measured and paid separatly, no of times carried out during entire period of contract |
| 112 | Dismantling and taking down alternator assembly from existing engine and transporting to workshop and carry out servicing / maintenance of alternator unit of capacity DG Set of Cap more than 20 KVA but not more than 100 KVA set set as per the phase work :- (a) Opening of Alternator and cleaning / remvoing dust from armature and field coil. (b) Cleaning of used / old lubricated substances drive/non drive end bearings. (c) Cleaning end checking of AVR unit (d) Checking and tighting of coupling bolts and replacement of rubber inserts. (e) M&L for carrying out heat varnishing for field and armature coil and kept in heating chamber for 48 hours for drying properly. (f) Replacement of Bearings as per existing size. (g) Reassembling complete unit and carrying out testing at workshop and transportation to installation and coupling with DG Set including necessary alignment, cable connections all as specified and directed by Engr - in Charge |
| 113 | all As above but the cap Of DG Set more than 100 KVA but not more than 250 KVA , Make : ' As availalbe at site' Please Enable Macros to View BoQ information |
| 114 | all As above but the cap Of DG Set more than 100 KVA but not more than 250 KVA , Make : ' As availalbe at site' Please Enable Macros to View BoQ information |