|
| 1 | Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 2 | Above 3.0 HP to 5.0 HP |
| 3 | From7. 5 HP to 10.0 HP |
| 4 | Repairing of submersible pump of with replacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 5 | Above 3.0 HP to 5.0 HP |
| 6 | From7. 5 HP to 10.0 HP |
| 7 | Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect. |
| 8 | Delowering and Lowering |
| 9 | Supply & fixing of GI pipes confirming to IS : 1239 P - 1 ( 2004 ) with socket,elbow,tee, flanges duly screwed & welded including rubber washer, nuts & bolts of 8mm dia complete in all respect. ( If Pipe Laid Underground Excavation and refilling cost will be paid extra) |
| 10 | 50 mm dia. |
| 11 | Rewinding of single phase motor of 1400 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 12 | 0.75 H.P. To 1.0 H.P. |
| 13 | 2.0 H.P. |
| 14 | Providing and Replacement of ball bearing of ceiling/ exhaust fan and refixing the same at suitable location as requiredand as per OEM recommendations. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material shall be retained by the contractor. |
| 15 | P & Replacement of cover/ bearing seat of ceiling/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 16 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. |
| 17 | Running capacitor |
| 18 | 10.0 micro farad |
| 19 | 15.0 micro farad |
| 20 | 20.0 micro farad |
| 21 | SITC of Monoblock closed coupled motor pump set with TEFC motor, motor should be IP55-F class and IE2 efficiency for monobloc, with carbon steel /SS-410 shaft, Mechanical seal, Single/Three phase Including cost of hardware etc on existing platform complete. Pump shall have following HP Rating, phase, Head, minimum Discharge respectively and Dynamically balanced rotating parts to ensure min. vibration etc. complete in all respect. |
| 22 | 1.0 HP, 1-Ø, (10-30)Mtr, (76-28) LPM ( Bronze impeller & CI Body) |
| 23 | GST@18% Please Enable Macros to View BoQ information |