| 1 | Engaging Labour for Miscelleanous Works |
| 2 | Engaging Welder for welding Works |
| 3 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 5 | All kinds of soil |
| 6 | Ordinary Rock |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, ending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :- |
| 11 | Foundations, footings, bases for columns |
| 12 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 13 | Providing Laying and Fixing and Hand Packing of Stones with T-Wire Crates all Complete Job (size of Crate 6.0 x 1.20 x1.20 with 4 mm Wire thickness and Mesh Size 0.15 m ) |
| 14 | Carriage of construction material by MT |
| 15 | Sand /Stone aggregates below 40mm nominal size average lead 10km |
| 16 | Stone average lead 10km Please Enable Macros to View BoQ information |