| 1 | Supply and Installation of Submersible Pumpset suitable for Cool & Clear water with bronze impeller and built in Non-Return Valve and suitable to run on 400 V 3 ph Hz AC supply at 2900 RPM Speed having three Meters Flat Cable The detailed specifications are as under :-Capacity in lpm ………………1000 LpmTotal Head in Mtrs ……………58 Mtr.Model …………………BODN302/8+UMAI-150O.D. Pump Set in MM ………144No of Stages …………………08Pump Out let size in MM ….…75H.P. Motor ……………………20Method of Starting ……………S.D.Size of Flat Cable in Sqmm 2 X 3 X 4 SQMM [MAKE: KSB/KIRLOSKAR/CROMPTON] |
| 2 | Starter & Control Pannel |
| 3 | Supply and Installation of Cubical dust & vermin proff switch board panel wall mounting type And comprising fo the following and complete with internal wiring.a) 100 Amp. TPN Switch Fuse Unit panel mounted type in open execution complete with HRC fuses and of make Siemens/L&T/Crompton of suitable size. 01 Nos.b) Voltmeter flush mounting type 500V in 100mm dial and of reputed make with Voltmeter Selector Switch. 1 Noc) Ampere meter flush mounting type of suitable range and of reputed make. 1 Nod) Indicating Lamps Set of 3 Nos. 1 Set.e) Toggle Switches Set of 3 Nos. 1 Set.f) Instrument fuses Set of 3 Nos. 1 Set.g) Single Phasing Preventor Minilec 1 No.h) Power Capacitor Asian/GE/Siemens make of suitable 5 KVAR. 1 No. (all equipments should be of approved PWD Makelist.) |
| 4 | Supply and Laying of Submersible cable 1x3x4Sqmm [MAKE: HAVELLS/POLYCAB/KEI/R.R. CABLE] |
| 5 | Supply and burying of 600mm x 600mm x 6mm G.I. plate vertically for earthing with its top at least 3 metres below ground level complete with 20mm dia G.I. pipe and funnel for watering and one earthing lead of one no. 8 to 10 SWG GI wire in 15mm dia G.I. pipe up to switch board (from appron to switch board the cost of G.I. pipe and G.I. wire will be extra) 30cm square C.I. frame with hinged cover masonry housing alternate layers of charcoal/coke and salt at least 150mm thick alround etc. as per directions of Engineer-in-charge complete in all respects as per drawing (This will apply for earthing of poles also). (all equipments should be of approved PWD Makelist.) |
| 6 | Supply and Fixing of Danger board |
| 7 | SUPPLY AND FIXING OF FOLLOWING MAIN PIPING & VALVES |
| 8 | C.l.D.F, siuice valve 150 mm dia (Make kirloskar/I.V.C) |
| 9 | C.l.D.F, Non Return valve 150 mm dia (Make kirloskar/I.V.C) |
| 10 | C.I.D.F. Tee for 150.mm.dia. |
| 11 | C.I.D.F. bends 90 degree for 150 mm dia |
| 12 | M.S. clamp 150 mm dia |
| 13 | Safty quard/ crossing ring |
| 14 | Cutting of housing cover |
| 15 | Nut, bolt and washer |
| 16 | Rubber packing |
| 17 | M.S.D.F. pipe 150 mm dia colum for M.S. Pipe 3 Mtr Long |
| 18 | MSDF Pipe 150 mm dia 1.50 mtr long |
| 19 | MSDF Pipe 150 mm dia 1.00 mtr long |
| 20 | Painting of Pumping Plant |
| 21 | Painting of all parts of the motors, pump, switchgear accessories, piping and Other iron or steel work not finished bright shall filled and painted With three coats of approved oil paint coat which shall be applied on after erection. |
| 22 | PRESSURE & DEPTH |
| 23 | 100 mm dia pressure gauge H-GURU big make 1 Nos.100 mm dia depth gauge H-GURU big make 1 Nos.6 mm airline of suitable length with stop cock union nipple, elbows etc. completeTeak Wood boards for mounting gauges |
| 24 | SUPPLY AND FIXING OF LIFITING TACKLE |
| 25 | Chainpully block 3 Ton capacity with 4 mtr. lift ofIndef/Reva make |
| 26 | SUPPLY OF SPECIAL TOOLS AND SPANNERS |
| 27 | D.E. Spanner Set (6 pcs.) (Gedore/Taparia/Everest make) 1 Set.Pipe Wrench 350 mm \\" \\" 1 No.Screw Drivers 12'' size \\" \\" 1 No.Screw Drivers 6'' size \\" \\" 1 No.Plier \\" \\" 1 No.Hand Air Pump \\" \\" 1 No.Hammer with Handle 1 No.20mm thick Tool Board make of Teak Wood with sunmica top of 450x600mm size 1 No. |
| 28 | Errection Charges of Pumping Plant |
| 29 | Testing & Commissioning of Pumping Plant |
| 30 | Running Period 1 Month |
| 31 | ELECTRONIC CHLORINATOR |
| 32 | Supply of Electronic Chlorinator of 6 LPH Capacity complete with accessories and PVC Solution Tank. [MAKE: THERMAX LTD./ WATCON/SIEMENS] |
| 33 | Supply of Orifice Plate (150 MM DIA) |
| 34 | Supply of Sodium Hypochlorite (70 Ltr. Drum) |
| 35 | Installation Charges |
| 36 | Cartage |
| 37 | EXTERNAL ELECTRIFICATION |
| 38 | Supply and errection of double pole (Bottom Portion Galvanised) 11 Mtr. long 410 SP-55 S.T. pole support duly grouted, plinthed , plastered & painted in the same manner as already specified for respective supports suitable for pole mounted type substation with different types of M.S. channels and angle iron duly fabricated for Disc fittings TPMO, D.O. fuse, outside dropper & bracings including cost of material, labour and T&P required for proper completion of work as per drawing and direction of E/I. |
| 39 | S/F of 11 KV TPMO set complete with all material, labour, T&P etc. required for proper completion of the work. |
| 40 | S/E of 11 KV D.O. fuse set complete with all material, labour, T&P etc. required for proper completion of work. |
| 41 | S/F Installation and Commissioning of 11/.433 KV, 63 KVA (EE Level-2) Transformer of following capacity including unloading, local carriage with all material, labour, T&P required for proper completion of the work. Only those make whose GTP is approved by DVVNL. |
| 42 | S/F of H.T/L.T jumpering and connection on double pole/four pole. lightening arrestors & T/F including cost of all material, labour T & P etc. required for proper completion of work. |
| 43 | S/F of lightening arrestor set (3 Nos.) suitable for mounting on steel supports complete with all materials, labour and T & P required of proper completion of work as per direction of E/I. |
| 44 | S/F of following GI pipe 'B' class for cable duly clamped with supports by 3 nos. with clamps of 20x3mm M.S. flat bolts nuts & washers required for proper completion of work. |
| 45 | 100 mm Dia |
| 46 | Making suitable earthing of ST Pole with 2.5 mtrs. Long 20 mm dia M.S. rod with 7/16 SWG G.S. wire in 15mm dia 2 mtrs long G.I. Pipe duly clamped with 3 nos. clamps and binding on poles including cost of labour & T&P etc. required for proper completion of work. |
| 47 | Supply and burring of Safe Earthing Electrode T-39 ( Hot Dip Galvanized) Length up to 3000mm, outer Dia 50mm inner 25mm, terminal Dia 12mm, outer G.I. Pipe of 16 SWG with Hot Dip Galvanization upto 100 micron filled with crystalline conductive mixture (CCM) having anti corrosive & conductive property with 50 kgs activated soil (BFC) capable of reducing the soil resistivity with good mixture of retaining capacity & one earthing lead of 25 x 3mm G.I. Strip, up to switch board (from apron to switch board, the cost of G.I. strip will be extra) along with 30 cm square C.I. frame with hinged cover & masonry housing. Make: As approved in U.P. P.W.D., & C.P.R.I. Certified |
| 48 | Supply and laying of XLPE cable 11 KV grade ata depth of 1.20 Mtrs below GL over a cushion of 75mm thick sand alround protected with bricks on sides and top on surface the cable run shall be fixed on M.S. Clamp etc. of suitable size and arossing the road cable shall run through 150mm dia hume pipe size of G.S. wire 7/10 SWG clipped at several places as directed by E/I for proper completion of work. The armouring of cable shall be properly connected with earth conductor by clamps etc. of following sizes. |
| 49 | 3x70 sqmm [MAKE: HAVELLS/POLYCAB/KEI/R.R. CABLE] |
| 50 | S/F of and jointing of 70 Sqmm out door (Make Raychem/3M) |
| 51 | S/Laying of Al. conductor PVC insulate armoured served. sheathed cable 1100V grade at a depth of 75cm below GL over a cushion of 75mm thick sand alround & protected with bricks on side on top. On surface the cable sun shall be fixed on M.S clamps of suitable size and crossing the road cable sun shall be fixed on M.S. clamp of suitable size & crossing the road cable should run through 150mm dia hume pipe and in case of air like category it shall be hanged with the help of G.I wire climpped at several places also armouring of cable shall be properly connected with earth conductor/terminal the job include the cost of all material, labour and T & P required for proper completion of the work. |
| 52 | 35 sqmm 3.5 core [MAKE: HAVELLS/POLYCAB/KEI/R.R. CABLE] |
| 53 | Supply and fixing of palm or pin copper tin plated cable socket (lugs) to the cable leads insulating with tape and making connections etc. complete in all respects. |
| 54 | 16 Sqmm |
| 55 | 35 Sqmm |
| 56 | Supply & Fixing of Wooden Meter Board. As per latest guidelines of UPPCL. |
| 57 | Supply & Fixing of 200 Amp. Kit-Kat fuse unit. |
| 58 | Neutral Link 100 Amp. Please Enable Macros to View BoQ information |