| 1 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. |
| 2 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 3 | 50.18.7.4.2:Providing and fixing PVC, pipes fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 6 Kgf/cm2 - internal work- Exposed on wall |
| 4 | 50.18.9.13.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10 Kgf/cm2- External work - Exposed on wall |
| 5 | OD213481/2025-2026:Engaging Plumbers for repairing leaking in water supply lines and repalcing damaged fittings including all cost of labour. |
| 6 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 7 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 8 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 9 | OD213499/2025-2026:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.I Sheet |
| 10 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 11 | OD213536/2025-2026:Supplying and fixing 300x300mm Square (FAZ TM) Manhole Cover with Frame 2.5 Ton Load Capacity, including cost of materials , labour charges etc complete |
| 12 | OD213537/2025-2026:The Ceiling surface is to be smoothened with modified mortar to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete |
| 13 | OD213538/2025-2026:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area .Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. |
| 14 | OD213539/2025-2026:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hirecharges of tools etc complete. |
| 15 | OD213549/2025-2026:Engaging Carpenter |
| 16 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) |
| 17 | 10.25.1:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete |
| 18 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work Please Enable Macros to View BoQ information |