| 1 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 2 | Supplying & Stacking of Filling earth at site including carriage loading & unloading (earth measured in stacks will be reduced 20% for payment). |
| 3 | S/o Wheeled Excavator Cum loader including P.O.L and driver complete as per direction of Engineer in charge. |
| 4 | Leveling in ordinary soil by mechanical device i.e Tractor 35 HP with cultivator/harrow and leveler wuth one no beldar etc |
| 5 | Supplying & Stacking of good earth at site including carriage loading & unloading (earth measured in stacks will be reduced 20% for payment). The Ph Value of good earth should be 5.50 to 8.50 only. |
| 6 | Supplying and stacking at Site Dump Manure form Approved Source Including carriage upto 5 k.m.lead complete (Cattle manure measured in Stacks will be reduced by 8% for Payment). |
| 7 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 8 | Rough dressing the trenched ground including breaking clods. |
| 9 | Fine dressing of the ground. |
| 10 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge. |
| 11 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 12 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)A. Holes 60 cm dia, and 60 cm deep |
| 13 | Supplying at site fine selection one grass free from weeds freshly lifted from a well maintained lawn. Grass will be supplied in carpets. |
| 14 | Grassing with selection No. 1/ Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). |
| 15 | S/o PlantsProviding and stacking of Plumeria alba dwarf of height 90-105 cm. with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer-in-charge. |
| 16 | Providing and stacking of Delonix regia (Gulmohar) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. |
| 17 | Providing and stacking of Tecoma gaudichaudi of height 45-60 cm. in earthen pots of size 20 cm as per direction of the officer-in-charge. |
| 18 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water)Tree Plants |
| 19 | Hedge Plants |
| 20 | Submersible pump boring as followingSupply of PVC pipe 6Kg /Cm2 pressure with required PVC standard special confirming to IS : 4985-2000 with latest amendment Make-finolex industries Ltd./Kisan/ Supremeindustries Ltd.( 140 mm dia with coupler @ 6kgf/cm2 pressure Note-1*419.52*18% GST = 495.03 Per Mtr |
| 21 | Supply of 50 mm dia G.I .Pipe Class B. Note-1*356.50*18% GST = 420.67 Per Mtr |
| 22 | Supply of Steiner Cloth coupler solution for jointing the pipe etc complete. |
| 23 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, upto 90 meter depth below ground level. up to 300 mm dia rate for 0-60 mtr depth.Note-1*386.20*18% GST = 455.72 Per Mtr |
| 24 | Supply and Fixing Submersible Motor pump ( Make –Kirloskar,KSB & CRI) 3HP.Note-1*27581*18% GST = 4932545.58 Per Nos |
| 25 | Supply of flat electrical cable three core 4.00 mm plaza make ISI mark. |
| 26 | Fencing Works Excavating holes mare than 0.10 cum & upto 0.5 cum including getting out the excavated soil. Then returning the soil as reqired in layer not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing of surplus excavated soil. As directed within a lead of 50 m and lift upto 1.5m. |
| 27 | Providing and laying in position cement oncrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1;2;4 (1 cement :2Coarse Sand ( Zone -III)4 graded stone aggregate 20 mm nominal size) |
| 28 | Supplying at site R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 29 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire used |
| 30 | Kaccha FootpathEarth work in excavation by mechanical means ( Hydraulic excavator ) manual means over areas ( exceeding 30cm in depth , 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth , lead upto 50m and lift upto 1.5m as direction by engineer –in-charge . The Contractor has defect different utilities like sewer line, water supply line, electric cable , Telephone cable , Gas pipe line etc, using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-charge. |
| 31 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:5:10 (1 cement : 5 Fine sand : 10 graded stone aggregate 40 mm nominal size) |
| 32 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 33 | Supplying and stacking at site of Moorum including speading. |
| 34 | Having total Wt. 70-75 kgs, size: 5 ft length garden benches (70-75 kg cast iron legs with 7 tank powder coating with 8 nos fiber 4mm thick strips with stainless steel nut bolt, Seating material frames/patii-FRP: ( Fibre-reinforced plastic). (With Supply, fixing, installation, G.S.T & Other taxes. |
| 35 | Dustbin Set of 3Capacity-80 litreMake-NilkamalSize-400 x 400 top, 300 x 300 Bottom, 900mm Ht.Stand made up of ISI marked SQ, Pipe of 35mm x 35mm x 18 gauge power coated. Size-4.5’ x 1.5’ x 750mm.(With Supply, fixing, installation, G.S.T & Other taxes. |
| 36 | Part-B Two year maintenance. Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & Cost /Supply lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge. |
| 37 | \\"Providing profuse watering arrangements at site to Make available RH pipe/Canvas Pipe & T&P Repairing of Submersible Pumps, DG. Set etc. in the process of watering as per direction of the in charge of work.Avarage 03 Nos Irrigation per month/acre total irrigation=36 Nos |
| 38 | Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc.(excluding the cost of material which shall be supplied by Per Sqm the department) and as per direction of officer in charge. |
| 39 | Maintenance of plants by providing malies for weeding hoeing, removal of grass providing ant- termite treatment, watering, stacking of Plants Including watch & ward complete . Mali for 600 Nos Tree Plants including Baugain Villia Plants ( Planted on Perifery of Barbed wire fencing /Boundary wall. ) One mali engaged for 600 nos tree plants |
| 40 | Provision of watering by boring including supply of water and RH pipe for boring to each plant and complete arrangments of watering as per direction of officer in charge.payment should be as per irrigation schecdule.Tree Plant (Ist and IInd Year maintenance) |
| 41 | Supplying and stacking at Site Dump Manure form Approved Source Including carriage upto 5 k.m.lead complete (Cattle manure measured in Stacks will be reduced by 8% for Payment). |
| 42 | Supplying and stacking at site of Moorum including speading. |
| 43 | Tractor with trolley including P.O.L. & Driver Please Enable Macros to View BoQ information |