| 1 | Construction of Compound wall and Arch at Keelapavoor Union Office Building Front Side in Kamaraj Nagar Village in Kulasekarapatty Panchayat. |
| 2 | Compound Wall Abstract |
| 3 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete |
| 5 | Centring charges for all concrete works including all cost and conveyance and all labour charges etc complete (Deck Slab Centering) |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x4 1/4\\"x2 3/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
| 8 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site etc., complete |
| 9 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 10 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 11 | Dadooing of walls with Colour glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with colour cement using 0.4kg/cm2 -10Sqm. |
| 12 | Supply and fixing of fancy glass shade and 7W / 9W LED bulb SD-79 |
| 13 | Arch Abstract |
| 14 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B |
| 15 | For first depth of 2m |
| 16 | For Second depth of 1m |
| 17 | For Corewall |
| 18 | Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification. |
| 19 | Supplying and filling with excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification. |
| 20 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete |
| 21 | 1.50m to 4.50m Below GL |
| 22 | 0.00m to 1.50m Below GL |
| 23 | Centering charges for RCC works including all cost and conveyance all materials to site etc., complete. |
| 24 | PLANE SURFACE:- |
| 25 | Below GL |
| 26 | Above GL (+5.300 - +6.300m) |
| 27 | Above GL (+6.300 - +7.300m) |
| 28 | SQUARE COLUMN:- |
| 29 | Below GL |
| 30 | Above GL (0.000 - +3.300m) |
| 31 | Above GL (+3.300 - +4.300m) |
| 32 | Above GL (+4.300 - +5.300m) |
| 33 | Above GL (+5.300 - +6.300m) |
| 34 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. |
| 35 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering. |
| 36 | 1.50m to 4.50m Below GL |
| 37 | 0m to 1.50m Below GL |
| 38 | Above GL (0.000 - +4.500m) |
| 39 | Above GL (+4.500 - +7.320m) |
| 40 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete |
| 41 | Plastering with CM 1:3 mix using to 10mm thick including all cost and conveyance of all materials and all labour charges etc., complete. |
| 42 | Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete. |
| 43 | Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 44 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |