| 1 | Working Charges |
| 2 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 3 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 5 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 6 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 7 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. |
| 8 | OD21759/2026-2027:Interconnecting existing 50/63/75/90/110 mm PVC pipe with newly laid 90 mm pvc pipe using suitable specials including Concrete/Tar cutting, earth work exavation, Cost of materials, labour charges etc |
| 9 | OD21769/2026-2027:Interconnection work with excisting 100 mm AC pipe using 110 mm pvc equal tee (10 kg), 100 mm CID including cost of materials Labour charges etc But excluding the cost of CID ( the area is semi waterlogged and existing water line sitiated at around 1.5 meter deapth |
| 10 | 100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead. |
| 11 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 12 | Appendix B Cost of Material |
| 13 | 100.98.234:Supply of PVC Pipe, 10kg/cm2, 63mm Dia. |
| 14 | OD21767/2026-2027:Supplying 100 mm CI Detached joints including rubber rings ,nuts & bolts conforming to BIS specification for class 10 ,15 & 20 for the 100 mm size Quality as per IS 8794 /1988 as amendment from time to time. |
| 15 | OD21770/2026-2027:Supply of 63 mm pvc end cap Please Enable Macros to View BoQ information |