| 1 | Lump sum rate for \\"LSTK Project for Flow Metering System with Data Integration & Mirroring at MPH, ONGC Ankleshwar\\" as per the Technical Bid Package |
| 2 | Amount of INSURANCE quoted in compliance of Clause 7.3 of GCC as per Annexure-II of Tender Document(excluding GST on insurance) Change In Laws and Regulations: Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the bidder’s lump sum prices for the Works (as quoted in the Price Format) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under: Sl. No ITEM Bidding Documents Clause Reference Laws / Acts / Rules / regulations reference Tarif indicating rate of tax/ duty/ fee/ charge/ levy Tax Amount included in the Lump sum price (Add taxes together for all locations/ works) 1.0 2.0 3.0 4.0 5.0 |
| 3 | IGST/ CGST & SGST/ UTGST as applicable Note:- |
| 4 | Bidder may suitably add other heads/columns/rows to indicate all the provisions and related information with regard to above. Bidders are requested to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. Strike out the items, which are not applicable or write `not applicable’. |
| 5 | The Taxes and duties shown above shall tally with the same quoted in Price Format. |
| 6 | Change in law shall not be applicable to taxes and duties in respect of subcontractors, venders etc. of contractors. |
| 7 | Bidder shall indicate the details of Laws/ Acts / Rules/ Regulations reference and tariff indicating rates of tax/ duties/ fee/ charge/ levy under Column 3 & 4 respectively in the unpriced bid also. |
| 8 | Bidders are advised to refer thoroughly scope of work (all disciplines), price impacting activities in the entire terms & conditions mentioned in the tender documents. Note 1: This excel workbook has two work sheets (BOQ1 and Change in Laws). Please fill both the sheets very carefully and upload as per this price format. Note: Please refer Clause no. 10.11 of Annexure - I regarding various CONCESSIONS PERMISSIBLE UNDER STATUTES & indicate the same. NOTES TO SCHEDULE OF PRICES: |
| 9 | Bidders to ascertain themselves all the applicable taxes & duties and include in their offer all such taxes and duties as applicable & quoted, which shall be considered for the purpose of evaluation. Bidders also to indicate ONLY such taxes & duties in relation to this contract, which the bidder is liable to pay directly to Indian Tax authorities . Reimbursement of IGST, CGST, SGST, UTGST etc. (which bidder is required to pay directly to Indian Tax Authorities) would, however, be made at actuals in Indian Rupees upon submission of documentary proof of duty assessment & payment (through deposit or through credit) thereof and would further be limited to the amount indicated in price schedule whichever is less. No reimbursement shall be made to the bidder for Custom Duty, IGST, CGST, SGST, UTGST etc., paid by bidders to their Sub Contractor, Vendors, Agents etc. Change in law is not applicable against such taxes & duties (i.e. Custom Duty, IGST,SGST,CGST,UTGST etc.) paid by bidders to their Sub Contractor, Vendors, Agents etc. |
| 10 | The above costs i.e. total lump sum price are all inclusive costs for providing the material & services as per the requirements contained in the Bidding Documents read with subsequent amendments/clarifications conveyed to the bidder. |
| 11 | Bidders shall submit copy of Price Proforma in the unpriced (techno-commercial) bid filled as 'Quoted' and/or 'Not Quoted' at places where bidder has quoted in original priced bid Proforma as a confirmation that he has quoted against that particular item. |
| 12 | Payment shall be made as per Milestone Payment Formula at SCC of Annexure-IV of Tender Document. |
| 13 | The lump sum price quoted in price format includes but is not limited to cost of all items of work included in the scope of work and other heads as stipulated in the bidding documents, drawings, specifications and to complete the subject work on Turnkey basis, irrespective of whether all the items of supply, erection and/or for any other activities are categorically listed out/ brought out in the price proforma or elsewhere in the bidding document or not. The Lump sum prices are inclusive of mobilization, demobilization and all taxes including but not limited to GST, Customs duty etc, statutory clearances and insurances as per bidding document. |
| 14 | It is noted that this is a case of Lump sum Turn Key work. All such works, which are deemed to be performed, executed and supplied by the Contractor for completion of works as stipulated in the bidding document and cost thereof is included. Non-familiarity and non-identification by the bidder, of any works will not be considered as a reason either for extra claims or for not carrying out the work in strict conformity with drawings, specifications and instructions of Company’s representative and Contract Document. Bidder has acquainted himself with the actual site conditions and made his own estimates of quantities and has to absorb all +/- variations in the quoted prices. |
| 15 | PRICE SHALL BE INDICATED IN FIGURES AND WORDS. IN CASE OF ANY DISCREPANCY, THE AMOUNT INDICATED IN WORDS SHALL BE TAKEN AS FINAL. Please Enable Macros to View BoQ information |