Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 12 days TDR #56044444

Tender for supply of asset performance management system (apms)

Issued by Boards / Undertakings / PSU · Numaligarh, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Aug 2026
12 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Numaligarh → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

supply of asset performance management system (apms) , design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection, testing at manufacturers works & packing, training to owner engineers, supervision of installation, transportation to site of the items listed in part-i of mr, including supply of all mandatory spares, commissioning spares & special tools and tackles, first fill of consumables, erection material & documentation as specified in the specification & documentation as per job specification, system architecture etc. and other codes and standards attached or referred in material requisition. mr ref:tp-1zzza-el-rfq-0016_d1 , central control and supervisory system design, engineering, supply, testing, site integration, pre-commissioning & commissioning activites,supply of special tools and tackles (as per manufacturer recommendation for apms),supply of pre-commissioning,commissioning and start-up spares (as per manufacturers recomendation for apms), factory acceptance testing (fat) and site acceptance test (sat) as per mr: tp-1zzza-el-rfq-0016. commodity code: 166100 , mandatory / capital spare parts supply of mandatory spares as per spare parts - special tools and consumables philosophy annexure-4 “tp-1zzza-pq-prc-0005” for asset performance management system , training to 2 nos. of owner personnel at oem’s factory for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , supervision services for installation of the entire package from oem for 5 days note:the quoted charges shall include all travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of “24 months after commissioning or 36 months after dispatch whichever is earlier” over and above the standard warranty period. , supply of ac ups system (ss10), 115v,100% parallel redundant ups with common bypass. 115v,50hz, 20kva, 1ph, 0.8pf, ac ups system consisting of 2x100% parallel redundant configuration with common bypass, including condition monitoring as detailed in the specification tp-1zzza-el-spe-0017 & cell booster, as per typical sld & as per requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ups-501 , supply of ac ups system (ac distribution panel) ,115v ac, single front, non-draw out, compartmentalized db for ac ups having two incomer and outgoers as per feeder list & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-acdb-501 , supply of battery set for ups system, vented ni-cd type set of ni-cd type battery bank (2 x 100%) as per the duty cycle attached part of the requisition along with battery rack and other accessories as per sld & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ba-506 & 1u64-ss10-ba-507 , supply of battery isolation breaker for each battery bank - flame proof (ex-d) suitable for installation in gas group ii-c as per sld & requisition documents for all the above battery banks supplied in this lot (2 nos.) , supply of copper cables and accessories like lug and gland, etc. for interconnection of ups system and its acdb & ups system and its battery - as per sld & requisition documents for all the above ups system supplied in this lot. refer note 16 of sos , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups (1u64-ss10-ups-501) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups battery bank (1u64-ss10-ba-506 & 1u64-ss10-ba-507) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v acdb (1u64-ss10-acdb-501) , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups battery bank. other accessories (like aprons and gloves) for safe and proper commissioning, operation and maintenance of the battery bank. , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v acdb , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups battery bank , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v acdb , training to 2 nos. of owner personnel at oem’s factory for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supervision services for installation of the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of 24 months over and above the standard warranty period after the completion of the standard warranty as per general purchase conditions (gpc) / defect liability period as per general purchase conditions (gpc) of tender.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 15-Jul-2026 CORRIGENDUM_01 Date 23-Jul-2026
2 16-Jul-2026 Pre_Bid_Meeting_MOM Other 30-Jul-2026
3 16-Jul-2026 TQ_RESPONSE_01 Other 30-Jul-2026
4 16-Jul-2026 COMMERCIAL ADDENDUM_01 Other 30-Jul-2026
5 23-Jul-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 30-Jul-2026
6 31-Jul-2026 TQ_RESPONSE_03 Other 06-Aug-2026
7 31-Jul-2026 CORRIGENDUM_02 Date 06-Aug-2026
8 16-Jul-2026 Pre_Bid_Meeting_MOM Other 06-Aug-2026
9 16-Jul-2026 TQ_RESPONSE_01 Other 06-Aug-2026
10 16-Jul-2026 COMMERCIAL ADDENDUM_01 Other 06-Aug-2026
11 28-Jul-2026 TQ_RESPONSE_02 Other 06-Aug-2026
12 16-Jul-2026 TQ_RESPONSE_01 Other 13-Aug-2026
13 16-Jul-2026 COMMERCIAL ADDENDUM_01 Other 13-Aug-2026
14 28-Jul-2026 TQ_RESPONSE_02 Other 13-Aug-2026
15 16-Jul-2026 Pre_Bid_Meeting_MOM Other 13-Aug-2026
16 07-Aug-2026 TQ_RESPONSE_04 Other 13-Aug-2026
17 07-Aug-2026 CORRIGENDUM_03 Date 13-Aug-2026
18 31-Jul-2026 TQ_RESPONSE_03 Other 13-Aug-2026
19 14-Aug-2026 CORRIGENDUM_04 Date 27-Aug-2026

BOQ

Name of Work:- SUPPLY OF ASSET PERFORMANCE MANAGEMENT SYSTEM (APMS)
Sl. No. Item Description
1Design, engineering, manufacturing, procurement of materials and bought out components,assembly at shop, inspection, testing at manufacturer's works & packing, training to owner engineers,supervision of installation, transportation to site of the items listed in Part-I of MR, including supply of all mandatory spares, commissioning spares & special tools and tackles, first fill of consumables, erection material & documentation as specified in the Specification & documentation as per job specification, system architecture etc. and other codes and standards attached or referred in Material Requisition.MR Ref:TP-1ZZZA-EL-RFQ-0016_D1
2CENTRAL CONTROL AND SUPERVISORY SYSTEMDESIGN, ENGINEERING, SUPPLY, TESTING, SITE INTEGRATION, PRE-COMMISSIONING & COMMISSIONING ACTIVITES,SUPPLY OF SPECIAL TOOLS AND TACKLES (AS PER MANUFACTURER RECOMMENDATION FOR APMS),SUPPLY OF PRE-COMMISSIONING,COMMISSIONING AND START-UP SPARES (AS PER MANUFACTURER'S RECOMENDATION FOR APMS), FACTORY ACCEPTANCE TESTING (FAT) AND SITE ACCEPTANCE TEST (SAT) AS PER MR: TP-1ZZZA-EL-RFQ-0016.Commodity Code: 166100
3MANDATORY / CAPITAL SPARE PARTSSupply of Mandatory spares as per Spare parts - Special tools and consumables philosophy Annexure-4 “TP-1ZZZA-PQ-PRC-0005” for Asset Performance Management System
4Training to 2 Nos. of Owner personnel at OEM’s factory for 10 days for the entire PackageNote:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
5Training to 10 Nos. of Owner personnel at NREP Site for 10 days for the entire PackageNote:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
6Supervision services for Installation of the entire package from OEM for 5 daysNote:The quoted charges shall include all travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. The actual man days consumed shall be considered for payment.
7Bidder shall provide Per Diem rate for supply of Commissioning / Support Engineer from OEM who shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire packageNote:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
8Third Party Inspection (TPI) ChargesNote:Third Party Inspection Agency (TPIA) shall be engaged by Bidder from OWNER approved list of TPIA Agencies and charges related to TPIA shall be included by Bidder.
9Additional Warranty period of “24 months after commissioning or 36 months after dispatch whichever is earlier” over and above the standard warranty period.
10Supply of AC UPS SYSTEM (SS10), 115V,100% Parallel Redundant UPS with Common Bypass.115V,50Hz, 20kVA, 1Ph, 0.8pf, AC UPS system consisting of 2x100% parallel redundant configuration with common bypass, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 & Cell booster, as per typical SLD & as per requisition documents and shall include testing after erection, pre-commissioning & commissioning.Tag No:1U64-SS10-UPS-501
11Supply of AC UPS SYSTEM (AC distribution panel) ,115V AC, single front, non-draw out, compartmentalized DB for AC UPS having two incomer and outgoers as per Feeder list & requisition documents and shall include testing after erection, pre-commissioning & commissioning.Tag No:1U64-SS10-ACDB-501
12Supply of Battery Set for UPS System, Vented Ni-Cd Type Set of Ni-Cd type Battery Bank (2 x 100%) as per the duty cycle attached part of the requisition along with Battery rack and other accessories as per SLD & requisition documents and shall include testing after erection, pre-commissioning & commissioning.Tag No:1U64-SS10-BA-506 & 1U64-SS10-BA-507
13Supply of Battery isolation breaker for each battery bank - flame proof (ex-d) suitable for installation in gas group II-C as per SLD & requisition documents for all the above battery banks supplied in this Lot (2 nos.)
14Supply of Copper cables and accessories like lug and gland, etc. for interconnection of UPS system and its ACDB & UPS system and its battery - as per SLD & requisition documents for all the above UPS system supplied in this Lot. Refer note 16 of SOS
15Supply of Mandatory spares as per Spare parts, Special tools and Consumables philosophy “TP-1ZZZA-PQ-PRC-0005” for 115V AC UPS (1U64-SS10-UPS-501)
16Supply of Mandatory spares as per Spare parts, Special tools and Consumables philosophy “TP-1ZZZA-PQ-PRC-0005” for 115V AC UPS Battery bank (1U64-SS10-BA-506 & 1U64-SS10-BA-507)
17Supply of Mandatory spares as per Spare parts, Special tools and Consumables philosophy “TP-1ZZZA-PQ-PRC-0005” for 115V ACDB (1U64-SS10-ACDB-501)
18Supply of Special Tools and Tackles as per Manufacturer’s recommendation for the above 115V AC UPS
19Supply of Special Tools and Tackles as per Manufacturer’s recommendation for the above 115V AC UPS Battery Bank. Other accessories (like Aprons and gloves) for safe and proper commissioning, operation and maintenance of the battery bank.
20Supply of Special Tools and Tackles as per Manufacturer’s recommendation for the above 115V ACDB
21Supply of Pre-Commissioning / Commissioning / Start-Up Spares as per Manufacturer’s recommendation for the above 115V AC UPS
22Supply of Pre-Commissioning / Commissioning / Start-Up Spares as per Manufacturer’s recommendation for the above 115V AC UPS Battery Bank
23Supply of Pre-Commissioning / Commissioning / Start-Up Spares as per Manufacturer’s recommendation for the above 115V ACDB
24Training to 2 Nos. of Owner personnel at OEM’s factory for 1 Week for the entire Package (Including Condition monitoring).Note:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
25Training to 10 Nos. of Owner personnel at NREP Site for 1 Week for the entire Package (Including Condition monitoring).Note:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
26Bidder shall provide Per Diem rate for Supervision services for Installation of the entire packageNote:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
27Bidder shall provide Per Diem rate for supply of Commissioning / Support Engineer from OEM who shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire packageNote:The quoted charges shall include travel, Boarding, Lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. However, the actual man days consumed shall be considered for payment.
28Third Party Inspection (TPI) ChargesNote:Third Party Inspection Agency (TPIA) shall be engaged by Bidder from OWNER approved list of TPIA Agencies and charges related to TPIA shall be included by Bidder.
29Additional warranty period of 24 months over and above the standard warranty period after the completion of the Standard warranty as per General Purchase Conditions (GPC) / Defect Liability Period as per General Purchase Conditions (GPC) of Tender. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56044444
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 27-08-2026
Authority
Authority Name Numaligarh Refinery Limited
Work Description supply of asset performance management system (apms) , design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection, testing at manufacturers works & packing, training to owner engineers, supervision of installation, transportation to site of the items listed in part-i of mr, including supply of all mandatory spares, commissioning spares & special tools and tackles, first fill of consumables, erection material & documentation as specified in the specification & documentation as per job specification, system architecture etc. and other codes and standards attached or referred in material requisition. mr ref:tp-1zzza-el-rfq-0016_d1 , central control and supervisory system design, engineering, supply, testing, site integration, pre-commissioning & commissioning activites,supply of special tools and tackles (as per manufacturer recommendation for apms),supply of pre-commissioning,commissioning and start-up spares (as per manufacturers recomendation for apms), factory acceptance testing (fat) and site acceptance test (sat) as per mr: tp-1zzza-el-rfq-0016. commodity code: 166100 , mandatory / capital spare parts supply of mandatory spares as per spare parts - special tools and consumables philosophy annexure-4 “tp-1zzza-pq-prc-0005” for asset performance management system , training to 2 nos. of owner personnel at oem’s factory for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , supervision services for installation of the entire package from oem for 5 days note:the quoted charges shall include all travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of “24 months after commissioning or 36 months after dispatch whichever is earlier” over and above the standard warranty period. , supply of ac ups system (ss10), 115v,100% parallel redundant ups with common bypass. 115v,50hz, 20kva, 1ph, 0.8pf, ac ups system consisting of 2x100% parallel redundant configuration with common bypass, including condition monitoring as detailed in the specification tp-1zzza-el-spe-0017 & cell booster, as per typical sld & as per requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ups-501 , supply of ac ups system (ac distribution panel) ,115v ac, single front, non-draw out, compartmentalized db for ac ups having two incomer and outgoers as per feeder list & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-acdb-501 , supply of battery set for ups system, vented ni-cd type set of ni-cd type battery bank (2 x 100%) as per the duty cycle attached part of the requisition along with battery rack and other accessories as per sld & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ba-506 & 1u64-ss10-ba-507 , supply of battery isolation breaker for each battery bank - flame proof (ex-d) suitable for installation in gas group ii-c as per sld & requisition documents for all the above battery banks supplied in this lot (2 nos.) , supply of copper cables and accessories like lug and gland, etc. for interconnection of ups system and its acdb & ups system and its battery - as per sld & requisition documents for all the above ups system supplied in this lot. refer note 16 of sos , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups (1u64-ss10-ups-501) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups battery bank (1u64-ss10-ba-506 & 1u64-ss10-ba-507) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v acdb (1u64-ss10-acdb-501) , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups battery bank. other accessories (like aprons and gloves) for safe and proper commissioning, operation and maintenance of the battery bank. , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v acdb , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups battery bank , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v acdb , training to 2 nos. of owner personnel at oem’s factory for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supervision services for installation of the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of 24 months over and above the standard warranty period after the completion of the standard warranty as per general purchase conditions (gpc) / defect liability period as per general purchase conditions (gpc) of tender.
Basic Detail
Tender No TP/082176C/NRL/PQ/151
Bidding Type Tender
Location
City Numaligarh
State Assam
Key Dates
Publish Date 14 Aug 2026
Submission Date 27 Aug 2026
Open Date 28 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
228e0528-2d76-4bb1-b852-73bd680dca71.html
ATC_BID_DOCUMENT_ANNEXURES.xls
BOQ_960105.xls
Part_II_Technical_Bid_Documents.pdf
Part_I_Commercial_Bid_Documents.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 23, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 30, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 30, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 30, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 30, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 27, 2026
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 12 days
Aug 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Aug 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
html

228e0528-2d76-4bb1-b852-73bd680dca71.html

xls

ATC_BID_DOCUMENT_ANNEXURES.xls

xls

BOQ_960105.xls

pdf

Part_II_Technical_Bid_Documents.pdf

pdf

Part_I_Commercial_Bid_Documents.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders