| 1 | (Supply Part of DTR ( Ts.No. 10/2026-27) |
| 2 | Distribution Transformer (Ordinary) 11/0.4KV, 63KVA |
| 3 | Steel Tubular Pole (9Mtr Long) |
| 4 | Muffs with concerete filling |
| 5 | GO AB Switch unit (11KV,400A,25KA) Tripple pole O/D Type |
| 6 | D.O. Fuse unit |
| 7 | Providing of X-Arm 1) Cross Arm( 2800x100x50x6) @ 9.56Kg P/Mtr =4 (2) (460x 100X50X6) @ 9.56 Kg P/Mtr = 2, Nos.(3) (2800x75x40x6mm) @ 7.14 Kg P/Mtr=4 Nos, (4) (460x75x40x6mm) @ 7.14 Kg P/Mtr=1 (5) Ms Angle Iron (2800x50x50x6mm) @ 4.5 kg P/Mtr= 5 Nos.(6) ( 950x50x50x6mm)@ 4.50 kg/P/Mtr=2 Nos. (7) ( 450x50x50x6mm) @ 4.50 kg P/Mtr= 1 No. (8) ( 460x35x35x6mm) @ 2.6 kg P/Mtr = 2 Nos.) |
| 8 | Dis insulator Sets |
| 9 | Surge Arrester, 9KV Station class (porcelain Type) |
| 10 | Stay set complete (i/c stay clamps) in all respect |
| 11 | Pipe Earthing Set |
| 12 | Nuts & Bolts off size. |
| 13 | Aluminium Paint |
| 14 | Barbed Wire |
| 15 | Stay wire (7/3.15mm) (7.0kg per Stay Set) |
| 16 | LT Distribution Panel Box with MCCB (100A, 10KA 4P 1 No. 63KA, 4P) and SFU (32A, 4No. Rewirable) |
| 17 | Full Clamp |
| 18 | Half Clamp |
| 19 | Danger Plate |
| 20 | Aluminium Thimble |
| 21 | Aluminium Thimble |
| 22 | LT Cable (3.5Core) 95mm^2 |
| 23 | Energy Meter (3 Phase-4wire) DLMS Complaint 100/5A CT Type for 63KVA transformer |
| 24 | (Erection Part of DTR (Ts.No. 10/2026-27) |
| 25 | Digging of Pit for 2 No. Pole |
| 26 | Drilling of Holes in X-Arms |
| 27 | Preparation of Platform Structure Members Ci, Ai, I.E. X-Arm & Knee Bracing Set |
| 28 | Concreting of RCC Muff |
| 29 | Erection of X0Arms, Drop0out , Jumper & D Pole complete in all respect. |
| 30 | Providing Earthing Connection to G.O.Switch, Transformer, lightening Arrestor, LT Box, Meter Box etc. & pole in all respect. |
| 31 | Erection of 2 No. Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 32 | Earthing for 3 Nos. Earth ( Digging of pit,fixing of earth road,clamp, earth wire, and connecting to the structure, Providing Charcoal and Salt for the earthing and Filling of the pit with material in all respect. |
| 33 | Barbed Wire & Painting |
| 34 | Erection of 63 kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Mete complete in all respect. |
| 35 | Manual Carriage of 63KVA Sub Station & Allied materail for an average Lead of 1Km |
| 36 | (Supply Part of 3phase LT Line ( Ts.No. 10/2026-27) |
| 37 | Steel Tubular Pole (8mtr) |
| 38 | ACSR Conductor 6/1/3.35 (50mm^2) |
| 39 | Muffs with concerete filling |
| 40 | Shackle Insulator (16Kn) |
| 41 | D-Irons (U-Clamps) |
| 42 | LT Stay set |
| 43 | Nuts & Bolts off size. |
| 44 | Aluminium Paint |
| 45 | Earth Knob |
| 46 | Stay wire (7/10) |
| 47 | GI Wire ( 8SWG) |
| 48 | Earthing Set Complete |
| 49 | Angle Iron (75x75x6 ) [length 1.50Mtr +0.02 Mtr] |
| 50 | [Erection Part of 3phase LT Line (Ts.No. 10/2026-27] |
| 51 | Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 52 | Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 53 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 54 | Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 55 | Providing and filling RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 56 | Erection of Earthing Sets a)Digging of Pit b)Fixing of GI wire to the Earth system c) filling of Pit insulator complete in all respect. |
| 57 | Manual Carriage of ST Poles 8mtr Long & Allied materail for an average Lead of 1Km Please Enable Macros to View BoQ information |