| 1 | ERECTION PART HT LINE |
| 2 | Erection of LT line. Digging of pit, erection of Steel pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 3 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 4 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. |
| 5 | Laying of Cable :- Laying of Cable, sagging and Installation of Suspansion and Tension assembly, Sagging of AB Cable and Kits Cable Jointing etc complete in all respect., |
| 6 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., |
| 7 | Providing manual carriage and transportation of departmental materials from Central Store to the work site by the contractor at his own arrangement, including loading, unloading, handling, stacking, labour, tools & plants, transportation vehicles, fuel, watch and ward, and all other incidental charges complete in all respects as directed by the Engineer-in-Charge. |
| 8 | SUPPLY PART |
| 9 | L.T.Line LT Line |
| 10 | LT AB Cable [Size:LT AB Cable [Size: 120mm² {additional 3% sagging & wastage) |
| 11 | AAAC 7/3.15 (50mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 12 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) |
| 13 | Muffs (2000mm) with concerete filling |
| 14 | Stay Set Complete (i/c stay clamp) |
| 15 | Stay Wire (7/4 mm) (6.0 kg Per Stay Set) |
| 16 | Channel Iron (75x40x5) [Length- 1.50 Mtr + 0.2 Mtr] |
| 17 | Shackle Insulator (16 kN) |
| 18 | D-Iron (U- Clamps) with nut and bolts |
| 19 | Earth Knob |
| 20 | Full Clamp |
| 21 | Insulation Piercing Connector (IPC) having tap upto 50 sq mm |
| 22 | Anchoring Assembly |
| 23 | Suspension Assembly |
| 24 | Facade Hooks |
| 25 | LT Distribution Boxes (3 Phase- 4 bays) with spring loaded connection with stainless steel strap roll 20mm X.7mmx5Mtr+ Stainless steel Buckles 1 nos for each box |
| 26 | LT Earthing set complete (preferbly coil earthing) |
| 27 | GI Wire for earthing |
| 28 | Nut and Bolts |
| 29 | Red Oxide |
| 30 | Aluminium paint Please Enable Macros to View BoQ information |