| 1 | (Supply Part of 11KV HT Line) |
| 2 | HT Stay Set complete in all respect. |
| 3 | Nuts & Bolts off size. |
| 4 | Dis insulator |
| 5 | Pin insulator |
| 6 | Stay wire (7/3.15mm) (7.0kg per Stay Set |
| 7 | Channel Iron (100x50x6),AI Knee bracing (50x50x6), Ms Flat (50x6) for Cross aram, clamp etc as required. |
| 8 | (Supply Part of LT Line) |
| 9 | LT Stay Set ( i/c stay clamp) complete in all respect. |
| 10 | Egg Insulator |
| 11 | Shackle Insulator |
| 12 | D-Iron |
| 13 | Aluminim Paint |
| 14 | Erection of HT Line |
| 15 | Erection of S/T Pole 9 mtr long for (Double pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate,g) Painting of pole, complete in all respect. |
| 16 | Erection of S/T Pole 9 mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 17 | Re-sagging of Conductor (ACSR 6/1/3.35 mm²) Stringing and Sagging including binding with insulator complete in all respect. |
| 18 | Re sagging of GI Wire Guarding complete in all respect. |
| 19 | Erection of HT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 20 | Manual Carriage of ST Poles 9mtr Long Pole for an average Lead of 1Km |
| 21 | Re-erection of Tilted S/T Poles 9mtr Long |
| 22 | Erection of LT Line |
| 23 | Erection of S/T pole 8 mtr long, a) Digging Of Pit, b) Drilling Of Holes In Pole X-Arm, c) Erection Of Pole, d) Erec. Of X-Arm e) Shackle Insulator & D-Iron f) Filling Of Pit And Ramming g) Fixing of Nuts & Bolts h) Polishing of Pole with Aluminium Paint complete in all respect. |
| 24 | Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 25 | Providing & filling RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 26 | Manual Carriage of ST Poles 8mtr Long Pole for an average Lead of 1Km |
| 27 | Re-erection of Tilted S/T Poles 8mtr Long Please Enable Macros to View BoQ information |