| 1 | Dismentalling of Stone Masonary with Cement Sand Mortor l including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge |
| 2 | Earth work Excavation of Foundation in Ordinary soil mixed and Kanker with in 30m lead and 1.50 m lift including refilling of excavated earth in Traench including dressing and manual Compection. |
| 3 | Earth work in filling M.K.R. and Kanker Mixed soil lead upto 1.00km Transpoted earth and initial lift with manual compaction & Dressing in filling Reaches. |
| 4 | Earth work in M.K.R. and Kanker Mixed soil incorrecting Internal Section of Canal in Cutting Reaches between km 0.00 to 42.00. |
| 5 | Supplying & laying Sand filling including all cost of labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. |
| 6 | P.C.C. 1:3:6 in foundation with cement, Sand &( 22.4 to 53mm size) per cum Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge |
| 7 | R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge |
| 8 | Ist Class Brick Masonry work 1:4 Cement Sand Mortar including all labour T&P etc. fro Proper complection of work. as per direction of Engineer-in charge. |
| 9 | C.C. 1:2:4 with cement coarse Sand Mortar and 10-20mm stone grit including all labour T&P etc. for proper completion of work As per Direction of Engineer-in-charge |
| 10 | R.C.C. 1:1.5:3 with 10-20 mm gauge stone ballast Including all cost of labour material T&P etc. |
| 11 | Supply & Laying Dry Stone Pitching |
| 12 | Grouting Over Stone Pitching with Cement Mortor |
| 13 | Centering & Shuttering for R.C.C. including all cost of labour material T&P etc. |
| 14 | Steel Reinforcement, cutting bending, binding including all labour material T&P etc. |
| 15 | Raised Struck pointing with 1:3 cement sand Morter including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. |
| 16 | 12.50mm thick Cement Plaster (1:4) cm Including all cost of labour Material Labour T&P etc. |
| 17 | Finishing Walls with acrylic shooth exterior paint of required shade of new work (Two or more coat applied @ 1.67 Its/10 sqm over and Including base coat of water Proofing cement Paint applied @ 2.20 kg/10sqm) |
| 18 | Removal of Road by pass including all cost of labour material T&P etc. |
| 19 | Providing & Laying LDPE film 200 micron of first grade including all labour T&P etc. |
| 20 | Fixing of RCC Precast Boundry Piller including cost of all materials, labour and T&P etc. required for proper complection of work as per direction of Engineer-in charge. |
| 21 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 150 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. |
| 22 | Providing Laying and spreading of Speicified graded stone dust in drainage layer (Blanket Coat) in Uniform layer on a prepared subgrade and compaction with 8-10 T Power roller MORD Specification No .404.3.2 |
| 23 | Providing and Laying of Rubble Mouled Zig Zag interlocking concrete blcok pavements having thickkness 80mm as per drawings and technical specification Clause 1504. |
| 24 | Providing & Laying 100 mm Thick coarse sand in fillter including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge |
| 25 | Painting of two coat bitumen on top of Sleepers including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge |
| 26 | Making Construction joint in lined conccrete surface and filling groove with sealing compound including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge |
| 27 | Extra for Paver Charges in C.C. Lining |
| 28 | Centering & Shuttering for C.C. including all cost of labour material T&P etc. Please Enable Macros to View BoQ information |