| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 2 | Taking down chowkhats or frames and shutter n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. |
| 3 | Taking down chowkhats or frames and shutter exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. |
| 4 | Taking down shutters of any description not exc 1 sqm each complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 5 | Taking down shutters of any description exc 1 sqm each but not exc 2 sqm each complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 6 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. |
| 7 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. |
| 8 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., and removal from site complete all as specified and directed by Engineer-in-Charge. |
| 9 | Demolition of lime/Cement concrete unreinforced as in Ground Floor and paving exc. 15cm thick (above or below G.L.) complete including china mozaic,WC ,disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 10 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 11 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 12 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 13 | Dismantling existing Brick tiles or terracing tiles, single layer on roofs complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 14 | Demolition of Mud phuska in roofs, any thickness,including plastering and leeping (whether full thickness removed or only a part thereof) in any position including disposal of unservicable rubbish outside Cantt area complete all as specified and directed by Engineer in Charge. |
| 15 | Cleaning the RCC surface including flashings and junction of parapets etc with wire brushes and water and applying a coat of cement slurry @ 3 Kg/sqm of surface complete all as specified and directed by Engineer-in-Charge. |
| 16 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and omplete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. |
| 17 | Dismanting of wrought iron or mild steel of any description not otherwise provided for in any location and any position complete all as specified and directed by Engineer-in-Charge. |
| 18 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc, removing rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 19 | Dismantling wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets complete, all as specified and as directed by Engr-in-charge. |
| 20 | Dismantlling plain or corrugated steel sheeting in roof coverings in any position complete including disposal of unserviceable fillets outside cantt area all as specified and directed by Engineer in Charge. |
| 21 | Hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and directed by Engineer-in-Charge. |
| 22 | Cutting grooves or rebates in brick walls 75 mm wide and 65 mm deep and shaping horizontal face of groove with cement mortar 1:3 complete all as specified and directed by Engineer-in-Charge. |
| 23 | Disconnecting existing tanks of capacity exc. 250 ltr & n. exc. 500 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. |
| 24 | Disconnecting existing tanks of capacity exc. 500 ltr & n. exc. 1000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 25 | Disconnecting existing tanks of capacity exc. 500 ltr & n. exc. 1000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |