| 1 | Excavating over areas, n.exc 1.5 m deep and exc. 1.5 m wide for foundation and getting out in hard/dense soil complete all as specified and directed. |
| 2 | M & L for moorum/red bajri filling in floors or pavings, laid in layers not exceeding 15 cm thick, spread, levelled and rammed including watering compacting with 8-12 ton power roller to compact upto 98% modified proctor density complete all as specified and directed.(Note;- Stack measurement of moorum/bajri(loose quantity) shall be entered in measurement book as' NOT TO BE ABSTRACT\\" before making payment to the contractor) |
| 3 | M&L for hard core (broken stone) of gauge not exc 63mm, deposited, spread and levelled in layers not exc 15cm thick watered and well rammed to a true surface complete all as specified and directed. |
| 4 | M&L for PCC (1:3:6), type C-2 (using 40mm graded stone aggregates) as in foundation,filling and mass concrete complete all as specified and directed. |
| 5 | M&L for 600 mm bore reinforced cement concrete pipes, class NP2, laid and jointed complete all as specified and directed. |
| 6 | M&L for providing and Laying Dry lean Concrete (DLC) 100mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cemen content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting usign high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessaryfinishing etc complete all as specified and tolerances to be as per Table 900-1 of MaRTH specifications fatrf Road and Bridge work 2013 complete all as specified and directed.(Note: Cost of necessary T & P, other equipments, design mix & materials etc. shall be included the cost of this item.) |
| 7 | M&L for 10 mm thick sand cushion with clean river sand dulyclear of residual , organic and deleterious materials spread evenly to uniform thickness laid over DLC layer complete all as as specified and directed. (No additional amount to be paid for overlap) . |
| 8 | Supplying and laying of 400 micron thick HDPE sheet (Virgin Quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm over tack coat/sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm complete all as specified and directed.(Note: PV of HDPE sheet shall be submitted before claiming of any payment) |
| 9 | M&L for Pavement quality concrete(PQC) of minimum 28days field Flexural strength of 45Kg/ Sqcm or 4.5 Mpa, aggregate gradation as per Table 3 of IRC 15 2017, coarse aggregate of clean , hard strong, dense non-porous and durable pieces of crushed stone or gravel, fine aggregates of clean natural sand ofcrushed stone sand or combination of both using minimum 360 kg/cum of cement with non-circular virgin synthetic fibre of 12-18 mm length, specific gravity 1.34 to 1.39, UV stable, alkali resistant, with equivalent dia 15-40 micron, minimum meltingtemperature as 240°C and minimum tensile strength of 300 Mpa and at the rate as specified by the manufacturer. PQC laid, spread and compacted with slip-form paver of minimum 7.50 m width , including curing and tining by Texturing cum Curing Machinecomplete all as specified and directed. Required surface texturing to be done as specified in Clause 10 1 14 and Tabl~ 9 of IRC' 15-2017.(Note: Cost of necessary T & P, other equipments, design mix & materials etc. shall be included the cost of this item.) |
| 10 | M&L for forming 25 mm width expansion joint in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size. straight and smooth edges. Join cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil , vegetation and other debris. The join then filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant Placing of closed cell medium density, crossed linked polyethylene foam backup rod of 30 mm dia, over filler board and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant asper the method specified by the manufacture complete all as specified and directed. (Note: PV of Chemical Compound & Other material shall be submitted before claiming of any payment) |
| 11 | M&L for forming dummy/contraction joint with an initial sawcut of 3 mm soon after the concrete has set, upto a depth of 1 J3rd to 1 /41h the thickness of the slab, widening the first saw cut to 6 mm and 24 mm deep by using diamond bit cutter of appropriate size straight and smooth edges Joint cleaned thoroughly with application of compressed air. Joint shall bemade dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 8 mm dia application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212 , BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) OF +/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete all as specified and directed. (Note: PV of Chemical Compound & Other material shall be submitted before claiming of any payment) |
| 12 | M&L for Cutting of construction joints 25 mm deep and 10 mm wide by early entry saw cut using diamond bit cutter of appropriate size, straight and smoothn edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil , vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30minutes before placing the backup rod and pouring the sealant. Placing of closed cell medium density, crossed linked polyethylene foam backup rod of 12 mm dia, application of bond breaketape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN- 141875-2003 with minimum movement accommodation factor (MAF) of +I- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tapeafter filling of sealant as per the method specified by the manufacturer complete as specified and directed.(Note: PV of Chemical Compound & Other material shall be submitted before claiming of any payment) Please Enable Macros to View BoQ information |