|
| 1 | Dismantling and removing RCC columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 2 | Dismantling brick work or stone massonary work in lime or cement mortar under 3.00m height including stacking the useful materials for reuse and removing the debris within 50m lead etc. complete including labour cess as per direction of Engineer-in-Charge. |
| 3 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge. |
| 4 | Filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess etc. complete as directed by the Engineer-in-charge. |
| 5 | Providing and laying Cement Concrete (1:3:6) using 40 mm size hard granite metal free from weathered skinned and other deleterious materials including hoisting and laying concrete and curing for required days including all labours T&P, cost, conveyance, royalty all applicable and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-charge. |
| 6 | Providing and laying Cement Cconcrete M-20 with using 20mm and down graded size Crusher broken hard granite chips, sharp sand of approved grading and quality conforming to the specification, mixing by concrete mixer and placing manually on approved surface, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangways and scaffolding, chute with cost, conveyance, labour cess, royalties of all materials, site illumination hire and running charges of machineries required for the work as per approved drawing and specification with all cost incidental to the work etc. complete including labour cess as per the direction of the Engineer-in-Charge |
| 7 | Supplying cutting bending binding and placing in position uncoated HYSD bar reinforcement complete as per drawing and technical specification including all labours, cost, conveyance, labour cess, binding wire etc. complete as directed by Engineer-in-charge. |
| 8 | Providing and laying cement concrete M-25 with 20 mm size down graded black hard granite (crusher broken) stone chips free from weathered skin and other deleterious materials including hoisting and laying concrete curing for required days including all labour, cost, conveyance and royalty and all . of all materials etc. complete as directed by Engineer-in-charge. |
| 9 | Rigid and smooth centering and shuttering for R.C.C works including false works and dismantling them after casting including cost of materials, labour css etc. complete as per direction of Engineer-in-charge. |
| 10 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and breaking clods to maximum 5cm to 7cm including leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |