Name of Work:- Restoration to Distributary No.2A of Jajpur canal for 2026-27.
Sl. No.
Item Description
1
Clearing grass and removal of rubbish upto a distance of 50m outside the periphery of the working area on pre-measurement depositing the debris away from the work site with all leads, lifts and delifts with cost of labour, T&P, hire and running charges of all machineries including cess etc. complete as per direction of the Engineer-in-Charge.
2
Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and breaking clods to maximum 5cm to 7cm including leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge.
3
Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge.
4
Filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess etc. complete as directed by the Engineer-in-charge.
5
Providing and laying Cement Concrete (1:3:6) using 40 mm size hard granite metal free from weathered skinned and other deleterious materials including hoisting and laying concrete and curing for required days including all labours T&P, cost, conveyance, royalty all applicable and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-charge.
6
Providing and laying Cement Cconcrete M-20 with using 20mm and down graded size Crusher broken hard granite chips, sharp sand of approved grading and quality conforming to the specification, mixing by concrete mixer and placing manually on approved surface, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangways and scaffolding, chute with cost, conveyance, labour cess, royalties of all materials, site illumination hire and running charges of machineries required for the work as per approved drawing and specification with all cost incidental to the work etc. complete including labour cess as per the direction of the Engineer-in-Charge
7
Rigid and smooth centering and shuttering for R.C.C works including false works and dismantling them after casting including cost of materials, labour css etc. complete as per direction of Engineer-in-charge.
8
Conveying supplying and laying 150 mm dia NP-3 Hume Pipe including fixing collar joints with RCC including all labour and cost, conveyance of NP-3 Hume Pipe etc. complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.