| 1 | Supplying, installation, Testing & Commissioning of Street light LED fixture powder coated pressure die cast aluminium body with driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage protection, EMIEMC As per CISPR -15, lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin),SDCM (Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 <120 lm/Watt output .LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). |
| 2 | 150 watt |
| 3 | Supplying & drawing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 kV grade aluminium unarmoured cable of following size for in existing light pole for connection of the fitting to the pole box as required. |
| 4 | 3 x 4 Sq.mm |
| 5 | Supplying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 kV grade conforming to IS: 7098 (Part-1)- 1988 amended upto date aluminium armoured cable of following size for connection of the fitting to the pole as required. |
| 6 | 4 x 25 Sq.mm |
| 7 | Cutting of hard rock/road/ PCC/Paver Block for laying of UG cable for Street light pole to pole with the help of hilty/ hammer etc. i/c making good by laying in position cement concrete 1:2:4: (1 Cement :2 coars sand : 4 graded stone ) of size 0.2 B x 0.2 D mtr etc. as required. |
| 8 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing RCC/ HUME/ METAL pipe as required. |
| 9 | Upto 35 sq. mm |
| 10 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc..direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc., complete as required. |
| 11 | 63 mm dia (OD-63 mm & ID-51 mm nominal) |
| 12 | Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required. |
| 13 | Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. |
| 14 | Dismantling of Octagonal GI Pole of Various Height with street light Fittings From existing foundation i/c cutting of foundation bolts etc. and making good smooth surface & Re-errection of these poles on new foundation with street light fittings by suitable means i/c testing , commissioning etc. as required. |
| 15 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 16 | All kinds of soil |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 18 | \\"1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). |
| 19 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 20 | Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 21 | Supplying and fixing 4 Nos. 24 mm dia X 750mm long GI foundation bolt (EN8 grade) with nuts, washer including 2 Nos. template of 4mm thick size 320mm x 320mm with 4 nos. 28mm dia holes, to match with PCD of Pole base plate as reqd. (For 10-12 mtr Pole) |
| 22 | Supplying and fixing of terminal block suitable for16 to 25 sq.mm conductor -4 nos. & shorting links – 5nos. on DIN channel i/c providing and fixing DIN channel of suitable length – 2 nos. on the existing laminated sheet. Supplying and fixing 6 Amp, SPMCB, ‘C’ Characteristics Curve - 1/2 No. Earth stud - 1/2Nos. welded at suitable height two nos. washers, springs washers & nuts etc complete as required. |
| 23 | Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. |
| 24 | 4 X 25 sq. mm (28mm) |
| 25 | Supplying & fixing of pole window cover made of G.I of 3mm thickness with sleeve type arrangement on existing pole whose cover is missing i/c welding of sleeve around pole, providing and fixing allen bolt of suitable size as per direction of Engineer-in-charge. (Note: Sample must approve before installation at site). Please Enable Macros to View BoQ information |