| 1 | Safe loading & carriage including & proper stracking of following store material from ESC Lucknow /JE store to site of work . |
| 2 | 33 KV 3x300 sq mm XLPE Cable |
| 3 | 33 KV 3x300 sq mm XLPE St/Th J/Kit |
| 4 | 33 KV 3x300 sq mm XLPE O/D J/Kit |
| 5 | MS Channel 100x50x6mm for dropper and cable support |
| 6 | Cable laying by drill method HDD single circuit (All the material shall be provided by the contractor except 33kvcables) |
| 7 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on D/P with GI Pipe dia 6\\" its jumpring complete with clamps , nuts and bolts .(All the material shall be provided by the contractor except33kv cables & O/D J/K. )as per RESSPO NORMS |
| 8 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on cable stand/Switch Gear its jumpring complete with clamps , nuts and bolts GI pipe and MS channel 100x50x6mm for dropper and cable support .(All the material shall be provided by the contractor except 33kv cables & O/D J/K., MS Channel 100x50x6mm for dropper and cable support)as per RESSPO NORMS |
| 9 | High pressure testing of 33kv 3x300 sq.mm.XLPE cable .Testing equipment will be arranged by the contractor |
| 10 | Digging of pit of size 3x2x1 mtr. For making straight through joint 33KV work included filling of soil levelling and ramming of the same(ST/Th Providing by department ) |
| 11 | Painting of 33 kv feeder Name on the End type Double Pole/Cable Exposure/ Cable stand as per instruction of site engineer |
| 12 | Return of Balance material including Cable Drum from site to store, including handling, loading, unloading, and transportation as per project requirements |
| 13 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route to avoid possibilities of any kind of damage during digging of trench/drilling for laying cable and prepared route map including dept of cable, location of sth etc on to JE. (Scanning machine will be provided by the contractor) |
| 14 | REPLACEMENT OF JUMPHER BY LEAD 1X400/1X300SQMM ,AL LUG,NUT BOLT AND WASHER INCLUDING ALL LABOUR CHARGES |
| 15 | EARTHING OF POLE AND CABLE STAND,CABLE BY MS ROD AND EARTH WIRE,COPPER FLEX BOND INCLUDING LABOUR CHARGES AND MATERIAL |
| 16 | MARKING THE POLE NUMBER, CABLE NO AND MARKING OF I/C AND O/G .INCLIDING ALL MAT(danger board ,painting pole no ,33 kv line name marking ) |
| 17 | Providing and fixing of WARNING TAPE AND LAYING OF TAPE(INCLUDING ALL MAT.AND LABOUR WORK |
| 18 | Making of 33 kv J/kit |
| 19 | Supply of cable route marker |
| 20 | Supply of inspection kit Please Enable Macros to View BoQ information |