| 1 | Appendix I - |
| 2 | Clearing the site by means of labour |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 4 | Random rubble masonry with hard stone in foundation & plinth upto plinth in cement mortar 1:6(1 cement:6 coarse sand) |
| 5 | Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in- charge. |
| 6 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 7 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 10 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 11 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) |
| 12 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | Cleaning the old painted surface having algae and other impurities using pressure washer including labour and hire of pump etc complete |
| 15 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 16 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 17 | Filling with Quarry Muck Filling up low laying and water logged areas with local material /quarry muck , spreading in layers, leveling the top at site and consolidation by ramming ,etc,complete for improving the GBR value of sub grade |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work Please Enable Macros to View BoQ information |