| 1 | Clearing boundary line to a width of 1.5 m to facilitate Survey (Subjected to actuals) |
| 2 | Survey with prismatic compass(Subjected to actuals) |
| 3 | Providing & fixing 15 x 15 x 90 cm boundary stone of hard stone(Subjected to actuals) |
| 4 | first time uprooting of existing invasive species like acacia seedlings ,mangium,,Eupatorium, etc by manual means for the entire area of the plantation for assisting natural regenaration whereever necessary |
| 5 | Heaping the debris(1/2 rate of fsr) |
| 6 | Transporting charges of seedlings from Nursery to planting site including loading and unloading charges (from kottarakkara/maranad nurseries of kottarakkara Social forestry Range) |
| 7 | Head load Transport of seedlings to planting sites & distribution up to a lead of 50 Metres (including for casualty replacement 10 %) |
| 8 | Making Platform of size 60 cm x 60c m with 30 Cm depth inward slopes (June-July) |
| 9 | Digging pits of size 30 x 30 x 30 Cm in ordinary type moist soil |
| 10 | Covering pits, digging planting holes and planting seedlings |
| 11 | First year First Weeding(May-June). |
| 12 | Replacing Casualties using Polybag seedlings |
| 13 | First year Second weeding ( August-September) |
| 14 | Manually removing new coppice shoots by hand or by stamping them down using by foot pressure with espacement 2.5m*2.5m(fist time) |
| 15 | second time uprooting of existing invasive species like acacia seedlings ,mangium,kalampotty,Eupatorium, etc by manual means for the entire area of the plantation for assisting natural regenaration whereever necessary |
| 16 | First year Third weeding (November- December) |
| 17 | second time uprooting of existing invasive species like acacia seedlings ,mangium,kalampotty,Eupatorium, etc by manual means for the entire area of the plantation for assisting natural regenaration whereever necessary |
| 18 | Manually removing new coppice shoots by hand or by stamping them down using by foot pressure with espacement 2.5m*2.5m(second time) |
| 19 | Clearing boundary line to a width of 5.2 metre including fire tracing by scraping 1.8 m on either side (Decemebr- January) |
| 20 | Provision for sign board 6\\" x 4\\" and plantation boards including cost of materials and errection charges etc. complete |
| 21 | Formation of Staggered trenches of dimensions 1.20x 0.6 x 0.5. =.36m3= Nos) -100 Nos*.36=36 m3 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as |
| 22 | Contractors Profit Please Enable Macros to View BoQ information |