| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. SSR 2022-23.153/21/33 Sp.NO .BDW |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. By Mechanical Means SSR 2022.23 P.No.24/2.18 |
| 3 | Picking the road surface including sectioning etc. complete (BT surface.) |
| 4 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. CD.7 Page.No. 162 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) |
| 6 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 7 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG-30 bulk bitumen SSR SSR 2022-23PNO/INO 29/3.30 |
| 8 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction VG-30 Bitumen, including providing and laying seal coat sealing voids in a bituminious surface laid to the specified level and cross fall using Type A seal coat but excluding prime / tack coat. For Bitumen VG-30 bulk--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller SSR 22-23 /PNO/INO 36/4.12 |
| 9 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates)SSR 4.01 MORTH 513 |
| 10 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. SSR 2021-22 P.No. 23 / 2.29 |
| 11 | Spreading hard murum for side width complete Spec. No.: MORTH 408 SSR SSR 2022-23 P.No. 23 / 2.30 |
| 12 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete.SSR 2022-23 P.No. 2 / 2.31 |
| 13 | Providing and fixing Information Sign Board of Size 0.90 X 0.60m. Prepared on 16 gauge M.S. Sheet with Horizontal bracing of M.S. Flat on size 25 X 6 mm including Painting with One Coat Zinc Chrome primer and Two coats oil painting including two number of M.S. angle Iron Post of Size 50 X 50 X 6 mm of 2.70 m lomg including Conveying all taxes fixing in Ground with cement concrete1:4:8 block of 45 X 45 X 45 cm size as directed by Engineer in charge etc. complete. R.A. |
| 14 | BASIC TEST OF AGGREGATE…...Water Absorption, Specific Gravity,Impact Value /Crushing Value. |
| 15 | BASIC TEST OF AGGREGATE…Sieve Analysis. |
| 16 | SOIL / MURUM …..Sieve Analysis. |
| 17 | BITUMEN….Penetration, Softening Point, Flash & Fire Point, Specific Gravity |
| 18 | TOTAL ROYALTY AMOUNT AS PER RY STATEMENT |
| 19 | G.S.T. 18% Please Enable Macros to View BoQ information |