| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | All kinds of soil. |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 4 | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specification- A) Stone/Boulder |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work upto plinth level: |
| 6 | i) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 7 | 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 9 | Foundations, footings, bases of columns, etc. for mass concrete |
| 10 | b)lintels,beams,plinth beams,girders,bressumers and cantilevers. |
| 11 | Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Above Plinth level |
| 12 | Thermo-Mechanically Treated bars |
| 13 | P/L in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level: |
| 14 | 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 15 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up to floor five level excluding cost of centering,shuttering, finishing and reinforcement : |
| 16 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). |
| 17 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with |
| 18 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). |
| 19 | Half brick masonry with Ist class common burnt clay F.P.S. (non modular) bricks in superstructure above plinth level upto floor V level in |
| 20 | Cement mortar 1 : 3 (1 cement : 3 coarse sand) |
| 21 | Brick work with Ist class common burnt clay F.P.S (non modular)bricks in foundation and plinth in: |
| 22 | Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 23 | Steel work in built up tubular (round, square or rectangular tubes etc.) trusses etc., including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted including special shaped washers etc. complete. |
| 24 | Electric resistant welded tube (Conforming to IS:1611-1979) |
| 25 | 15 mm cement plaster on rough side of single or half brick wall of mix: |
| 26 | 1:4(1 cem:4 fine sand) |
| 27 | 12 mm cement plaster finish with a floating coat of neat cement of mix: |
| 28 | 1:3(1 cem:4 fine sand) |
| 29 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : |
| 30 | Water thinnable cement primer |
| 31 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade |
| 32 | New work(two or more coats)over and including priming coat with cement primer:- |
| 33 | Applying priming coat :- |
| 34 | with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works |
| 35 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: |
| 36 | Two or more coats on new work |
| 37 | Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods,watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guidebanks etc., lead upto 50 m and lift upto 1.5 m. |
| 38 | All kinds of soil Please Enable Macros to View BoQ information |