| 1 | Civil works |
| 2 | Cleaning shurb jungle including uprooting rank vegetation, grass, bushes, shurbes,sapling removal of stumps of trees and disposal of unsevicable materials and stacking of servicable materials to be used up to lead of 1000 meters and as per direction of EIC. |
| 3 | Excavation of founation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P etc. comp. as directed by EIC. |
| 4 | Filling sand in F&P well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. |
| 5 | P.C.C .of prop.(1:3:6) in foundation using 20 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC. |
| 6 | C.C. of prop. (1:2:4) in foundation and all floors using 12mm size hard crusher broken granite chips of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. comp as per direction of EIC. |
| 7 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills in Foundation |
| 8 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills in Column |
| 9 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills in pre-cast Column. |
| 10 | Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) |
| 11 | Supplying, fitting, fixing of M.S grill in square bar as per approved drawing size and design using structural M.S angle flat, round or square bars with well welded and placing in proper position including all cost, conveyance of all materials, T & P etc. to complete the work in all respect as per direction of EIC. (The design & drawing of grill shall be provided & approved by EIC) |
| 12 | Supplying, fitting and fixing of 2 ply barbed wire fencing by means of staples and hooks and fixed with RCC pre-cast Column including cost of all materials, T&P to complete the work in all respect as per direction of EIC. (Barbed wire of TATA WIRON to be used) |
| 13 | 6mm thick cement plaster (1:4) to RCC surfaces/ ceiling in all floors finished smooth including closed deep chiping and slury treatment with neat cement punning including watering and curing etc. Comp. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC. |
| 14 | Providing and painting two coats with synthetic enamel paint over a coat of red oxide primer of approved quality and approved shade confirmming to ISI on steel work to give an even shade in all floors at all height including sand papering and making the surface smooth with cost, coveyance, loading and unloading, and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge.(Synthetic enamel paint of ICI/Berger/Asian is to be used) |
| 15 | Weather coat two coats of approved brand and shade over a coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used) Please Enable Macros to View BoQ information |