| 1 | Part A- Construction of LT line using 9Mtr long 300Kg PSC pole with 4X50+1X50 + 1X16mm2 ABC= O. 73Km (22Nos. Span) |
| 2 | Supply & installation of 9 Mtr. Iong 300 Kg. PSC Pole.Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. ComComplete in all respect as per the approved technical specification and direction of EIC. |
| 3 | Supply & installation of LT Stay set Complete Complete in all respect as per the approved technical specification and direction of EIC. |
| 4 | Supply & installation of 7/12 SWG GI stay wire, Grade -2.Complete in all respect as per the approved technical specification and direction of EIC. |
| 5 | Supply & installation of LT stay Clarnp ( 1.40Kg/pair) Complete in all respect as per the approved technical specification and direction of EIC. |
| 6 | Supply and installation of LT Stay insulator Complete in all respect as per the approved technical specification and direction of EIC. |
| 7 | Supply and installation of Pole clamp for EYE Hook for XLPE AB Cable.Complete in all respect as per the approved technical specification and direction of EIC. |
| 8 | Supply & installation of EYE Hook for XLPE AB Cable. Complete in all respect as per the approved technical specification and direction of EIC. |
| 9 | Supply & installation of Dead End Clamp Suitable for messenger XLPE AB Cable Complete in all respect as per the approved technical specification and direction of EIC. |
| 10 | Supply & installation of Suspension clamp with EYE HOok for ABCComplete in all respect as per the approved technical specification and direction of EIC. |
| 11 | Supply & installation of 4C x 50 sq. mm. + 1C x 50 sq. mm. + 1C x 16 sq. mm. (Street light) LT AB Cable Complete in all respect as per the approved technical specification and direction of EIC. |
| 12 | Supply & installation of IPC COnnector Type A main 50 - 150 sq. mm. and Tap 50 to 150 sq. mm.. Complete in all respect as per the approved technical specification and direction of EIC. |
| 13 | Supply & installation of GI PIpe Earthing (Each 5th pole to earth) Complete in all respect as per the approved technical specification and direction of EIC. |
| 14 | Supply & installation of coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 15 | Supply & installation of No 8 GI Wire (4.6 mm) 0.131 kg/mtr - 2 mtr per connecting pole with coil earthing.Complete in all respect as per the approved technical specification and direction of EIC. |
| 16 | Supply & installation of LT Danger plate Complete in all respect as per the approved technical specification and direction of EIC. |
| 17 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 18 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 19 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 20 | Supply & installation of GI Nut, Bolt & Washer of different sizes (0.5 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 21 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 22 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 23 | Part A- Cost of Civil Works. |
| 24 | Fixing of LT line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excavation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing , Standard & as per the direction of EIC. Excavation of earth will be made of size (500 x 500 x 1500 mm) |
| 25 | Concreting ratio 1:1.5:3 M20 Grade (500mmX500mm X1500mm) = 0.375 Cu.mtr(Per pole).Complete in all respect as per the direction of EIC. |
| 26 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 27 | Part B- Construction of LT U.G. cable with 4C X 70mm2 with riser & spare on HDD method = 2x60Mtr.= 120Mtr |
| 28 | Supply of 1.1 kV, 4Core, 70 sqmm, XLPE insulation armoured -Aluminium UG cable Complete in all respect as per the approved technical specification and direction of EIC. |
| 29 | Installation, Laying, Commissioning & Testing of LT XLPE U/G cable by HDD method with HDPE pipe (110mm dia, PN8 PE80) including supply of HDPE Pipe. Complete in all respect as per the approved technical specification and direction of EIC. |
| 30 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 31 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |