| 1 | Pre Monsoon works |
| 2 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means |
| 3 | 4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method |
| 4 | OD43517/2026-2027:Cutting of grass and light jungle using brush cutter with all expenses |
| 5 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 6 | OD43520/2026-2027:Engaging man mazdoor wherever required. |
| 7 | 3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres. |
| 8 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) |
| 9 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 10 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. |
| 11 | 55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. |
| 12 | OD43515/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees/ branches of trees of any girth including stacking of serviceable material and disposal of unserviceable material without making any damages to nearby structures etc |
| 13 | OD43518/2026-2027:Engaging tipper for loading and unloading materials ( hourly basis) |
| 14 | OD43519/2026-2027:Engaging JCB |
| 15 | OD43731/2026-2027:Filling up pot holes with bituminous ready mix compound (25 Kg/bag)and compacting by ramming to get a compact surface including cost of materials, laying charges transportation to site etc complete- Rate is arrived for a bag of 25 Kg after applying tack coat on surface. Please Enable Macros to View BoQ information |