| 1 | Removal of Silt for Nala/Nali in liquid mud or faul position with special T&P including lead 30m and lift up to 3.00m etc. all complete. (As per Attached sanctioned rate analysis) |
| 2 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) |
| 3 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 4 | Providing of Nala Bandha With local sand including etc. all complete. (Atached per Annalysis rate). |
| 5 | Providing of 32HP desel Pump set for dewatering including hire and fuel charge with operator etc. all complete. (None Scheduled) |
| 6 | Providing and Fixing of Barricading of 100mm dia average ballies with in a distance of 1.50 meter for 3 rows of 3 Q, 3 nos of Cross ballies, two supporting ballies of 3 meter ballies and 2 nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (Material will be property of Contractor after dismantling). |
| 7 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 8 | RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 in raft foundation (1cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size) |
| 9 | Reinforced cement concrete work in walls/columns (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size) |
| 10 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter Si.No.8) |
| 11 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B)) |
| 12 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft ) including Painting, Lettering etc. all complete. (None Schedule) |
| 13 | Sub Total |
| 14 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 15 | Grand Total Please Enable Macros to View BoQ information |