Schedule: C - Conversion of BG into ART (All Equipment Vans) as per NFR/SK/002/2024 that i ncludes supply of materials, and Labour Cost for Stripping, and fitment as per detailed Scope of Work in An nexure - III. ]
2
Schedule: D - Labour for conversion of BG into ART (All Equipment Vans) for Electrical Work a s per NFR/SK/002/2024 as per detailed Scope of Work as mentioned in Annexure - V. ]
3
Schedule: B - Conversion of BG into ART (All Equipment Vans) as per NFR/SK/002/2024 that i ncludes supply of materials, and Labour Cost for Stripping, Gas Cutting and fitment as per detailed Scope o f Work attached in Annexure -II schedule B(I) & Consumables for conversion into ART (All Equipment Vans) as per detailed attached in Annexure - II schedule B(II). Terms & condition attached at Annexure D. ]
4
Schedule: A - Conversion of BG into ART (All Equipment Vans) as per NFR/SK/002/2024 that i ncludes Supply of materials, and Labour Cost for Stripping and Fitment as per detailed Scope of Work as m entioned in Annexure - I. ]
5
Schedule E: Exterior surface preparation of coaches, Lettering and Anti-Graffiti Coating As pe r Annexure - VI Consisting of (a) Exterior Surface preparation of coach prior to paint booth (complete remov al of old paint and application of Putty) (b) Supply and Application of lettering outside of coaches (Lettering work using De-Cal material) (c) Supply and apply of Anti-Graffiti painting. ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.