|
| 1 | INTER LOCKING TILES AND NALI NIRMAN |
| 2 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work,( asper analysis LESS deductiom 12.50% settlement |
| 3 | Dismantling of old and damage drain brick work including labour and T&P etc.required for proper completion of work,(Chpt-17/692) l type drain |
| 4 | Disposal of dismentling cc road material with cartage upto distance 5.00 km i/c loading and unloading 90 % of item no-1 including supply of all material,labour and T&P etc.required for proper completion of work (Chpt-3/231a) |
| 5 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) drain base |
| 6 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) |
| 7 | 12mm thick Plaster in 1:4with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis) drain wall |
| 8 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) |
| 9 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 10 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (Chpt-20/new20) |
| 11 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Grey tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (Chpt-20/new20) |
| 12 | Supply and fixing of Iron work such as heavy size Iron for channel including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-10/503) |
| 13 | Add sign board of granite stone |
| 14 | gst Please Enable Macros to View BoQ information |