|
| 1 | INTER LOCKING TILES AND NALI NIRMAN |
| 2 | Dismentaling of old and damage cc interlocking tiles including supply of all material labour and T&P etc requird for proper completion of work 18/new-4) LESS |
| 3 | Disposal of dismentalling cc road material with cartage upto distance 5.00 km i/c loading and unloading 90% of item no-1 including supply of all material labour and t&p etc required for proper completion of work (chpt 3/231a) |
| 4 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work,( asper analysis area as per item no 1total a deduction 12.50% settlement |
| 5 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) drain base |
| 6 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) l type drain both side base |
| 7 | 12mm thick Plaster in 1:4with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis) drain wall |
| 8 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) drain cc |
| 9 | Providing,laying,spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber,applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density ( for Grading-II) same area as per item no 1 |
| 10 | Providing,laying,spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber,applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density ( for Grading-II) same area as per item no 1 |
| 11 | supply & laying of 80mm thick l shaped vibrator made interlocking cement concerte pavers block(colour tiles isi mark) including joint filling with loacal sand supply of all material labour T&P ec required for proper comletion of work same area as per item no 1 |
| 12 | supply & laying of 80mm thick l shaped vibrator made interlocking cement concerte pavers block(grey tiles isi mark) including joint filling with loacal sand supply of all material labour T&P ec required for proper comletion of work same area as per item no 1 |
| 13 | supply & laying of 80mm thick l shaped vibrator made interlocking cement concerte pavers block(labour raet only) sme area as per sail |
| 14 | mild steel or iron work such as channel including supply of all material labour and T&P etc required for proper completion of work as pe sail |
| 15 | Add sign board of granite stone |
| 16 | gst Please Enable Macros to View BoQ information |