Bids Are invited for Supply, Installation, Testing, Commissioning And Integration In The Existing Cyber Highway Network - Mounting Of Wall Mount 15U Racks , Rack Dressing Of 15U Rack Including Tagging/Labeling Etc , Fixing And Termination Of 24 Port
Tender Overview
Project Description
Bids Are invited for Supply, Installation, Testing, Commissioning And Integration In The Existing Cyber Highway Network - Mounting Of Wall Mount 15U Racks , Rack Dressing Of 15U Rack Including Tagging/Labeling Etc , Fixing And Termination Of 24 Port Patch Panel , Laying Of Pvc Conduits/Casing/Pipe/Flexible Pipe With Accessories Like Screws, Joints, Bends, Saddles And Other Accessories For Completing The Job , Fixing & Termination Of Information Outlet Io , Laying Of Hdpe/Gi Pipes With Accessories Like Couplers, Bends And Other Accessories For Completing The Job , Laying Of Ofc Cable , Fixing Of Liu , Ofc Pig Tails Splicing & Ofc 6- Cores Fusion-Splicing Using Jointing Kit , Fixing Of Ofc Route Markers Using Cement Concrete, Bricks And Other Accessories For Completing The Job , Terminating Connectors On Ofc Per Core , Soft Soil Trench Digging Upto 3 Feet Depth And Refilling After Laying Cables , Digging Hard-Soil / Surface Upto 3 Feet Depth , Road Cutting And Digging Trench , Surface Restoration (Cementing/Concrete ) , Online Ups Installation With Battery Bank, Iron Stand & Electrical Cabling , Earthing Pit (Chemical-Earth, Less Than 2 Ohm , Less Than 2 Volts Between Earthing & Neutral), Permanent And Maintenance Free (Pmf) Type , Laying Of Power Cable , Installation Of Multi Power Switch & Socket , Mounting And Configuration Of Network Devices. Devices Must Be Cl Ed & Screwed Properly In The Rack Maintaining Necessary Spacing. , Shifting Charges For Equipments Along With Racks & Its Components From One Location To Another Including Decommissioning, Transportation, Reinstallation, Integration Etc , Preventive Maintenance Of 15U Racks , Repair & Trouble Shooting Of I/O Jacks , Penta Scanning Testing Of Io Nodes , Documentation And Certification Of Utp Cables , Otdr Testing Report , Documentation And Certification Of Fibre Cables , Oem Certified Site Engineer For The Period Of Contract Total Quantity : 1
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Jul-2026 | 17-Jul-2026 | ||
| 2 | 17-Jul-2026 | 24-Jul-2026 | ||
| 3 | 24-Jul-2026 | 07-Aug-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Mounting of wall mount 15U Racks | Mounting of wall mount 15U Racks |
| 2 | Rack dressing of 15U Rack including tagging/labeling etc | Rack dressing of 15U Rack including tagging/labeling etc |
| 3 | Fixing and Termination of 24 Port Patch Panel | Fixing and Termination of 24 Port Patch Panel |
| 4 | Laying of PVC Conduits/Casing/Pipe/flexible pipe with Accessories like screws, joints, bends, saddles and other accessories for completing the job | Laying of PVC Conduits/Casing/Pipe/flexible pipe with Accessories like screws, joints, bends, saddles and other accessories for completing the job |
| 5 | Fixing & Termination of Information Outlet IO | Fixing & Termination of Information Outlet IO |
| 6 | Laying of HDPE/GI Pipes with accessories like couplers, bends and other accessories for completing the job | Laying of HDPE/GI Pipes with accessories like couplers, bends and other accessories for completing the job |
| 7 | Laying of OFC cable | Laying of OFC cable |
| 8 | Fixing of LIU | Fixing of LIU |
| 9 | OFC Pig Tails splicing & OFC 6- Cores fusion-splicing using jointing kit | OFC Pig Tails splicing & OFC 6- Cores fusion-splicing using jointing kit |
| 10 | Fixing of OFC Route Markers using cement concrete, bricks and other accessories for completing the job | Fixing of OFC Route Markers using cement concrete, bricks and other accessories for completing the job |
| 11 | Terminating Connectors on OFC per core | Terminating Connectors on OFC per core |
| 12 | Soft Soil trench Digging upto 3 feet depth and refilling after laying cables | Soft Soil trench Digging upto 3 feet depth and refilling after laying cables |
| 13 | Digging hard-soil / surface upto 3 feet depth | Digging hard-soil / surface upto 3 feet depth |
| 14 | Road cutting and Digging trench | Road cutting and Digging trench |
| 15 | Surface restoration (Cementing/concrete ) | Surface restoration (Cementing/concrete ) |
| 16 | Online UPS Installation with Battery bank, Iron Stand & Electrical Cabling | Online UPS Installation with Battery bank, Iron Stand & Electrical Cabling |
| 17 | Earthing PIT (Chemical-Earth, less than 2 ohm , less than 2 volts between earthing & neutral), permanent and maintenance free (PMF) type | Earthing PIT (Chemical-Earth, less than 2 ohm , less than 2 volts between earthing & neutral), permanent and maintenance free (PMF) type |
| 18 | Laying of Power Cable | Laying of Power Cable |
| 19 | Installation of Multi power Switch & Socket | Installation of Multi power Switch & Socket |
| 20 | Mounting and configuration of Network Devices. Devices must be clamped & screwed properly in the rack maintaining necessary spacing. | Mounting and configuration of Network Devices. Devices must be clamped & screwed properly in the rack maintaining necessary spacing. |
| 21 | Shifting charges for equipments along with racks & its components from one location to another including decommissioning, transportation, reinstallation, integration etc | Shifting charges for equipments along with racks & its components from one location to another including decommissioning, transportation, reinstallation, integration etc |
| 22 | Preventive maintenance of 15U Racks | Preventive maintenance of 15U Racks |
| 23 | Repair & trouble shooting of I/O jacks | Repair & trouble shooting of I/O jacks |
| 24 | Penta scanning Testing of IO Nodes | Penta scanning Testing of IO Nodes |
| 25 | Documentation and Certification of UTP cables | Documentation and Certification of UTP cables |
| 26 | OTDR Testing Report | OTDR Testing Report |
| 27 | Documentation and Certification of Fibre cables | Documentation and Certification of Fibre cables |
| 28 | OEM Certified Site Engineer for the period of contract | OEM Certified Site Engineer for the period of contract |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender